AIXX Pedia The encyclopedia of compute hardware

AIXX Pedia › Model Entry › A100 80GB

NVIDIA A100 80GB official image (vendor image)
Vendor Image · AIXX Pedia (NVIDIA official site)

A100 80GB

NVIDIA Ampere Generation · Installed-base Circulation Mainstay · 80GB HBM2e · Model Entry #006

Overview OVERVIEW

A100 (Full name NVIDIA A100 Tensor Core GPU, part of the "Ampere" family) is the data center GPU NVIDIA announced at GTC on May 14, 2020 Data center GPU unveiled at GTC: the opening shot of the Ampere generation, debuting third-generation Tensor Cores (TF32 and structured sparsity) and MIG multi-instance partitioning (up to 7 instances per card)[1][4]; The 80GB version Announced on November 16, 2020, with HBM2e memory doubled and bandwidth exceeding 2TB/s (officially billed as the "world's fastest memory bandwidth")[2]. Available in both SXM and PCIe form factors with 40GB/80GB capacity options, it is the only "full OEM lineup"-level installed base in this library's Model Entries.

It was the "AI compute hard currency" of its generation, the one before H100: when ChatGPT ignited the global compute arms race, A100s powered the training clusters of every major player. It was also among the first batch of models locked down by the October 2022 US export controls on China — the China-market Variant A800 and the October 2023 tightening of controls form a complete policy timeline (see "History" and "Limitations & Controversies").

In the 2026 spot market, the A100's role is Installed-base continuation : The product line has entered end-of-life (channels received full-line EOL notices in early 2024, per channel accounts [9]); new cards via legitimate channels are essentially unavailable, and circulation consists mainly of retired machines, channel inventory, and secondhand units. The 80GB HBM2e still holds up in inference and traditional HPC scenarios, but the memory-generation gap versus the H200 (141GB HBM3e) and B300 (288GB HBM3e) is plainly visible. This entry carries no market-rate band — the A100 no longer has a unified market rate, actual price subject to the seller's quote 。

Use Cases FIT

AIXX Index (0–100): this library estimates via publicly available specs, weighted — memory 40% + interconnect 30% + ecosystem 30%, adjusted per use case, with an EOL status correction applied. 90+ flagship-grade · 75+ Excellent · 60+ usable · below 60 not applicable. The methodology is transparent and reproducible, and does not constitute a performance guarantee.

LLM Inference 72AIXX Index
A single 80GB card can deploy 13B-class models in FP16 and 70B-class in INT8 (though headroom is tight for the latter); INT8 at 624 TOPS remains usable inference throughput.
Model Training / Fine-tuning 70AIXX Index
The Ampere ecosystem is extremely mature after six years and has an enormous installed base; but with no FP8/Transformer Engine, training efficiency has been left a generation behind by Hopper.
HPC / FP64 Computing 85AIXX Index
FP64 Tensor Core at 19.5 TFLOPS plus 80GB of memory keeps it competitive in scientific computing and simulation — newer data center GPUs generally de-emphasize FP64, making this the A100's unique stronghold.
Cost-sensitive Inference 78AIXX Index
Post-EOL channel prices have come down, making cost per unit of compute attractive — but condition, warranty, and data center load history are pricing variables, and inspection costs belong in the total calculation.
Large-memory scenarios (long context / full R1) 52AIXX Index
80GB×8=640GB cannot fit R1 at full capacity (roughly 1.3TB in FP16, ~690GB in FP8, estimated) — for such needs, go straight to the H200/B300 entries.

History HISTORY

announced at GTC on May 14, 2020 , NVIDIA unveiled the Ampere architecture and the A100 (40GB version launched first) at GTC: third-generation Tensor Cores brought TF32 and structured sparsity to data center GPUs for the first time, and MIG carved a single card into up to 7 instances with QoS guarantees; the DGX A100 announced the same day pushed 8-card systems into AI data centers[1][4].

On November 16, 2020 , the 80GB version was announced: HBM2e capacity doubled, bandwidth exceeded 2TB/s, and 8-card systems totaled 640GB of memory[2]; the PCIe version rolled out shortly after. Over the following year-plus, the HGX A100 8-card system became the standard form factor for global AI compute expansion.

In August–October 2022 , U.S. export controls on China took effect: A100/H100 exports to China required licenses, with the formal rules effective October 13, 2022[5][7]; NVIDIA promptly launched the China-market Variant A800 (with reduced Interconnect Bandwidth to stay under thresholds), which became the mainstay model in mainland China's market through 2022-2023 (per public reporting[7]).

In October 2023 Controls tightened, and the A800/H800 were likewise placed under license management; China-bound demand subsequently shifted to the H20/L20/L2 China-market Variant line (per public reporting from November 2023[7]). The A100 itself remained on the control list throughout and never returned to the list of approved exports to China.

2024–2026 , the product line entered its final phase: the channel received EOL notices for the entire A100 lineup in early 2024 (per channel-relayed reports[9]); installed-base machines and retired data center units became the mainstay of the spot market, with gray-market and smuggling cases involving high-end GPUs appearing in public reporting[8][10]. After the H200 was approved for China in December 2025 (per public reporting[12]), the generational handover accelerated further.

Technical Specifications SPECIFICATIONS

ItemSpecifications (A100 80GB · official figures; SXM / PCIe listed separately where applicable)
GPU CoreNVIDIA Ampere GA100
Board Memory80GB HBM2e (same capacity on SXM and PCIe; a 40GB version also exists)
Memory Bandwidth2,039GB/s(SXM)/ 1,935GB/s(PCIe)
FP64 / FP64 Tensor Core9.7 / 19.5 TFLOPS
FP3219.5 TFLOPS
TF32 Tensor Core156 TFLOPS (312 sparse)
BF16 / FP16 Tensor Core312 TFLOPS each (624 sparse)
INT8 Tensor Core624 TOPS (1248 sparse)
GPU-to-GPU InterconnectNVLink 3rd generation · 600GB/s (NVSwitch full mesh on HGX baseboards; 600GB/s dual-card via bridge on PCIe)
Host InterfacePCIe Gen4 · 64GB/s
Board Power (TBP/TGP)SXM 400W (up to 500W for the HGX custom thermal CTS SKU, official footnote) / PCIe 300W
Multi-instance partitioningMIG up to 7 instances @ 10GB (per-instance memory doubled on the 80GB version)
Mainstream System Form FactorsHGX A100 4/8/16-GPU baseboards · DGX A100 8-GPU · partner 1-8 GPU appliances
Previous Generation / Competing ProductV100 / H100, A800 (China-market Variant derivative)

Specifications per NVIDIA's official product page (verified 2026-10)[1]; "sparse" figures are the officially asterisked structured-sparsity numbers—dense performance is half; CTS (Custom Thermal Solution) is per the official footnote for the HGX A100-80GB.

80GBA100 · HBM2e 80GBH100 · HBM3 141GBH200 · HBM3e 288GBB300 · HBM3e Board memory capacity · generational comparison (NVIDIA official figures)

Generational Comparison · Four Generations Side by Side GENERATIONS

ItemA100 80GBH100 80GBH200B300
Board Memory80GB HBM2e80GB HBM3141GB HBM3e288GB HBM3e
Memory Bandwidth~2TB/s3.35TB/s4.8TB/s~8TB/s
Flagship precisionFP16 (TF32 + sparsity debuted here)FP8(Transformer Engine)FP8FP4
GPU-to-GPU InterconnectNVLink 3 · 600GB/sNVLink 4 · 900GB/sNVLink 4 · 900GB/sNVLink 5 · 1.8TB/s
One-line buying adviceInstalled-base continuation · mostly second-handBudget ceiling · largest ecosystemLarge memory · volume mainstayFlagship new purchase · next generation

Specifications per NVIDIA's official public materials[1]; see the respective entries for H100/H200/B300 comparisons.

Family Members FAMILY

The A100 family splits into four branches by memory capacity and form factor, plus the China-market Variant A800; 2026 spot circulation is dominated by the 80GB version (SXM/PCIe) and retired units:

A100 40GB PCIe / SXM (2020 launch version)A100 80GB SXM4 (mainstay of HGX A100 baseboards)A100 80GB PCIe (300W dual-slot card)A800 (China-market Variant, reduced interconnect)HGX A100 4/8/16-GPU baseboardsDGX A100 (NVIDIA's official 8-GPU appliance)

Cooling & Deployment COOLING

The A100's cooling form factor is stated plainly in the official spec sheet: the SXM version runs 400W passive cooling , with heat removed through the chassis airflow of the HGX baseboard system (the official footnote for the HGX A100-80GB Custom Thermal Solution CTS SKU supports up to 500W[1]); the PCIe version is 300W dual-slot air-cooled card , and an official single-slot Liquid-cooled variant is also available[1]. What this means for buyers: SXM systems (DGX/HGX) require whole-rack planning of data center power and airflow, while the PCIe card is the lowest-friction path for adding GPUs to an older facility.

MIG is A100's deployment legacy that still matters today: a single card can be split into up to 7 10GB instances, each with QoS guarantees, and combined with Kubernetes and container orchestration (per official pages[1]), small teams can carve one retired A100 among multiple inference services—one reason it still finds buyers on the second-hand market.

Model Compatibility MODEL FIT

Model / ScenarioMemory requirements (FP16 estimates)A100 deployment (8 GPUs, 640GB)AIXX Index
DeepSeek R1 full (671B)FP16 ~1.3TB / FP8 ~690GBDoes not fit — the A100 also lacks FP8, and eight GPUs in FP16 provide only 640GB; evaluate cross-node deployment or Quantization separately38
70B-class open modelsFP16 ~140GBWon't fit on a single 80GB card; start with dual-card tensor parallelism; borderline on one card after INT8 Quantization (KV cache needs careful budgeting)70
7B–14B classFP16 ~14–28GBComfortable on one card; batch pipelines rely on MIG slicing or multi-card concurrency88
Scientific computing / FP64 simulationDepends on mesh sizeFP64 Tensor at 19.5 TFLOPS + 80GB memory — the A100's traditional stronghold85

Memory estimated as FP16 weights ≈ parameter count × 2 bytes (estimated; KV cache and activation headroom not included); the A100 does not support FP8 — pipelines migrating to FP8 should go straight to the H100/H200. The AIXX Index reflects this library's estimates and is updated with measured data.

NVIDIA A100 80GB official image (vendor image)
NVIDIA A100 80GB · official image (NVIDIA website og image)
A100 80GB SXM module launch image
A100 80GB SXM module · launch material
A100 80GB module with official uplift figures
A100 80GB module and official uplift figures · launch material

Actual photos are added continuously as inspection batches are stocked; AI-generated images are never passed off as real photos.

Software & Ecosystem ECOSYSTEM

ItemRequirements / Status
CUDAAmpere supported from 11.0 (launch release), full coverage in the current 12.x
DriverFrom the 450 series (launch), ongoing driver compatibility
Training frameworksPyTorch / TensorFlow officially support Ampere — one of the most mature ecosystem generations
Inference enginesvLLM / SGLang / TensorRT all supported, but H100 has taken over as the reference machine in public benchmarks
MIG supportWorks with Kubernetes and container orchestration (per the official page), a mature multi-tenant partitioning solution
Operating systemMainstream Linux distributions (Ubuntu 20.04+ and similar)

The Ampere ecosystem is extremely mature after six years, with the best legacy codebase compatibility; software stack versions evolve over time — defer to NVIDIA's official releases. Post-EOL driver and security update cadence should be confirmed with the OEM/channel before purchase.

Purchasing & Inspection PROCUREMENT

Three inspection checkpoints when buying an A100:

1
First, distinguish SXM / PCIe and 40GB / 80GB
"Low-price A100" quotes often refer to the 40GB or PCIe version — a tier apart from the 80GB SXM; a 40GB passed off as an 80GB is hard to spot in photos, so capacity and form factor must be spelled out in quotes and contracts.
2
Post-EOL warranty and spares verification
Channels received full-lineup EOL notices in early 2024 (per channel reports) — whether the warranty is active, whether it transfers with the batch, and whether the spares channel has narrowed directly determine the residual value of this stock; shipping documents must be verified and retained.
3
Hands-on testing of retired units
Installed-base Circulation consists mainly of data center retirements and channel inventory: power-on hours, data center load history, hands-on memory testing, and independent serial-number verification are essential procedures; asking "any mining cards?" means little for an A100 (see "Limitations & Controversies") — ask about load history instead.

The complete six-item burn-in test criteria (values anchored to the A100) are in this entry "How to Stress-Test" section.

How to Stress Test BENCH TEST

Six-item Burn-in Test criteria, all value benchmarks anchored to the A100: unboxing identification → single-card Burn-in Test (SXM 400W / PCIe 300W, ≤85℃ with zero ECC errors = Pass) → full-system Full Load → memory bandwidth (SXM rated 2,039GB/s, ≥85% = Pass) → Interconnect Bandwidth (NVLink rated 600GB/s, nccl-tests ≥500GB/s) → inference throughput (≥80% of public benchmarks).

1
Unboxing & Identification
nvidia-smi settles it at a glance: A100-SXM4-80GB / A100-PCIE-80GB — a 40GB posing as an 80GB is instantly identifiable; cross-check the silkscreen against firmware reports.
2
Single-card Burn-in Test
Burn-in at Full Load per 400W for SXM and 300W for PCIe: temperature ≤85℃ and zero ECC errors = Pass (per the benchmark framework).
3
Full-system Full Load
An HGX A100 8-GPU appliance draws roughly 3.2kW at full GPU load (8×400W, estimated, excluding CPU and fans); verify facility power against the appliance's rating.
4
Memory Bandwidth
SXM rated at 2,039GB/s (PCIe 1,935GB/s); measured ≥85% (~≥1.7TB/s) = Pass (estimated) — memory is the most common target of refurbishment tampering.
5
Interconnect Bandwidth
NVLink rated at 600GB/s; nccl-tests bus bandwidth ≥500GB/s = Pass (estimated); for a PCIe card without a bridge, skip this item and record it as such.
6
Inference throughput
≥80% of public benchmarks = Pass; retired units often have a laggard card — test all eight individually before combined testing.

Shipping & Delivery LOGISTICS

1
Customs & Compliance Documents
The A100 is an export-controlled model (controlled since 2022-10); cross-border customs pathways and compliance status directly affect warranty and value retention, and shipping documents must be verified and retained; compliance attributes are subject to competent-authority policy and professional advice — this library's statements reflect public reporting and do not constitute legal advice.
2
Shipping Insurance
Insuring high-value equipment at full value is industry practice; EOL models have steep residual-value curves, so write coverage amounts and claims pathways into the contract.
3
Joint Inspection on Arrival
Check seals, exterior, and serial numbers one by one against the Inspection Report; photograph and document any discrepancy on the spot.

OEM & Variants VENDORS

On the same HGX A100 baseboard, OEM systems differ in form factor, cooling, and service; the 8×A100 system roundups from the ChatGPT compute boom (Supermicro / Inspur / ASUS / Dell / Gigabyte) serve as a form-factor reference for installed-base machines[11]:

System VendorRepresentative Form FactorDifferentiatorsStatus as of 2026
SupermicroHGX A100 8-GPU appliance (Air-cooled / Liquid-cooled)Volume mainstay, full range of form factorsInstalled base and retired unit circulation
DellPowerEdge line (HGX A100 8)Tier-one global service networkInstalled-base Circulation · Depends on Service Contract
InspurNF5488A5 and others (HGX A100 8)Common in Asia-Pacific and domestic projects, with full reviews from professional mediaMainstay of the domestic installed base
GigabyteHGX A100 8 complete systemFlexible configurations, strong APAC channel presenceInstalled-base Circulation
NVIDIA officialDGX A100 (8-GPU system)Official turnkey delivery with full-stack software and OEM backingEOL · OEM channel winding down

OEMs' current flagship lines have moved to Hopper/Blackwell platforms; A100 systems now circulate mainly as installed-base and retired units. Refer to official vendor announcements for specific models[11].

Glossary Cards GLOSSARY

HBM2e Memory

The enhanced second generation of high-bandwidth memory. The A100 80GB carries 80GB of HBM2e per GPU with 2,039GB/s SXM bandwidth—HBM2e is also where the A100 falls a generation behind its successors: starting with the H100, HBM3/HBM3e more than doubles both capacity and bandwidth.

MIG (Multi-Instance GPU)

A first on the A100: a single GPU can be partitioned into up to 7 instances, with up to 10GB of memory per instance on the 80GB version, each fully isolated with QoS guarantees. A practical feature for multi-tenant inference and small-model cloud production; whether MIG partitions correctly should also be part of acceptance testing.

NVLink 3 / SXM4

Third-generation NVLink delivers 600GB/s per GPU; the SXM4 mezzanine package (GPUs soldered onto the HGX baseboard) with NVSwitch enables full 8-GPU interconnect; the PCIe version offers only dual-GPU 600GB/s via bridge—interconnect topology is the core of the SXM vs PCIe price gap.

TF32 and Structured Sparsity

Two precision technologies introduced with the A100: TF32 speeds up single-precision training without code changes; structured sparsity (officially marked with an asterisk) doubles peak throughput, but requires model pruning—dense throughput is halved—so always ask whether figures are sparse or dense when reading spec sheets.

A800 and Control Batches

The A800 is a China-market Variant of the A100 (with downgraded interconnect bandwidth to meet the October 2022 control thresholds); after the October 2023 tightening it was brought under control along with the A100. Batch and customs routing affect warranty and resale value—always check during acceptance; all statements here reflect publicly reported accounts and do not constitute legal advice.

Limitations & Controversies LIMITS

  • Memory and Bandwidth Generational Gap : 80GB HBM2e / ~2TB/s, vastly outclassed by the H200 (141GB / 4.8TB/s) and B300 (288GB / ~8TB/s); the A100 also lacks FP8—the famous case of "R1 at full size doesn't fit" being only the most cited example (estimated figures, see "Model Compatibility")—this is the root of the divide with its successors in sourcing decisions.
  • Central Figure in the Export Control History : The October 2022 rules placed the A100 under China export licensing[5]; the A800 China-market Variant was brought under the same regime in October 2023[6] and never returned to the approved list thereafter (the H200 was the one approved for China in December 2025[12])—no new cards are openly sold through authorized mainland channels, and spot circulation falls under installed-base and gray channels (per public reporting[8]). This library records only publicly reported information and does not constitute legal advice.
  • EOL and Spare-Parts Risk : The channel received EOL notices for the entire A100 lineup in early 2024 (channel-relayed; no official press release from the vendor[9])—warranty status, spares channels, and firmware update cadence are hard constraints that must be verified item by item before purchase.
  • Refurbishment Risks of Secondhand Decommissioned Units : Installed-base Circulation consists mainly of retired data center units and channel inventory, with refurbished units and "40GB passed off as 80GB" risks side by side; gray-market and smuggling cases involving high-end GPUs appear in public reporting[8][10]—independent serial-number verification plus measured memory testing are essential procedures.
  • 400W Power Draw and Data Center Requirements : The SXM version draws 400W (up to 500W for the CTS SKU, per official footnote[1]); an 8-card system's GPUs total roughly 3.2kW at Full Load (estimated), and passive cooling depends entirely on system airflow—adding cards directly to an older facility is less practical than the PCIe version (300W dual-slot); work out the power and cooling math before deployment.
  • The Misleading "Mining Card" Question : The A100 has no display outputs and was never a mining mainstay, so the "no mining history" question has limited meaning (per this database's inspection experience; industry common sense); the real risks are 7×24 high-load aging in data centers and decommissioned-unit refurbishment—the right question is "data center load history and power-on hours," not "was it ever used for mining."

Market Notes MARKET NOTE

A100 · Market Band Not Yet Available

The A100 has reached the end of its product line (EOL per channel reports[9]); the spot market consists mainly of installed-base machines, retired units, and channel inventory, with condition, warranty, data center duty history, and channel terms driving extreme price dispersion—there is no verifiable unified market rate, AIXX Pedia honesty principle: no market band; prices are subject to the seller's quote 。

Spot search: AIXX Exchange Hall › (Zero-commission Matching; no involvement in transactions; no knowledge of or speculation on transaction prices — hence data neutrality). This section will switch to a standard market band once enough snapshots accumulate.

FAQ FAQ

Is the A100 80GB still worth buying?

It depends on price and warranty: for inference (especially 7B–14B-class and MIG-sliced multi-tenant workloads) and traditional HPC/FP64 scenarios it still holds up, and the Ampere ecosystem remains among the most mature of any generation; but the product line is EOL (channel-reported), making warranty, spare parts, and resale value hard constraints. If budget allows or you need an FP8 production line, go straight to the H100/H200.

How big is the gap between A100 and H100?

Both start at 80GB, but a full generation apart: HBM2e at ~2TB/s versus HBM3 at 3.35TB/s, NVLink 600GB/s versus 900GB/s, FP64 Tensor 19.5 versus 67 TFLOPS—and the H100 debuted FP8/Transformer Engine—training and inference efficiency are a generation apart. The A100's unique turf is its mature ecosystem and used-market price gap.

Can the A100 be bought for the Chinese market?

The A100 has been under US export controls for China since October 2022, with the China-market Variant A800 brought under control in October 2023 as well; no new cards are publicly sold through legitimate mainland channels, and spot circulation consists of installed-base units and gray-market channels. This reflects publicly reported accounts and does not constitute legal advice; before purchasing, defer to regulator policies and professional compliance advice.

How to tell 40GB from 80GB (anti-fraud)?

nvidia-smi settles it in one shot: A100-SXM4-80GB / A100-PCIE-80GB are directly distinguishable by name from the 40GB version; then cross-check with silkscreen, official firmware reports, and measured memory testing—the three-piece verification kit; photos alone are unreliable (see "Procurement & Inspection" and "How to Stress-Test").

Is the A100 a mining card? What to watch when buying used?

The A100 has no display outputs and poor mining economics for compute cards—it was never a mining mainstay, so the "no mining" question has limited meaning; the real risks are 7×24 high-load aging in data centers and decommissioned-unit refurbishment. The right approach for buying used: ask about data center load history and power-on hours, verify post-EOL warranty status, and run the six-item stress test (measured memory and Interconnect Bandwidth are the priorities).

B300H200H100H20GB300 NVL72NVLinkA800 (China-market Variant)HGX A100 8DGX A100

Model comparison and selection COMPARE

References REFERENCES

  1. NVIDIA official site — A100 product page (primary spec reference, verified 2026-10) https://www.nvidia.com/en-us/data-center/a100/
  2. NVIDIA A100 80GB Brings Double the Memory (announcement and module images, 2020-11-16) https://www.servethehome.com/nvidia-a100-80gb-brings-double-…
  3. GPU database — NVIDIA A100 PCIe 80GB (second source, 2021-06 channel records) https://www.techpowerup.com/gpu-specs/a100-pcie-80-gb.c3623
  4. NVIDIA — NVIDIA Ampere Architecture whitepaper (GA100, 2020-05) https://images.nvidia.com/aem-dam/en-zz/Solutions/data-cente…
  5. FR 2022-21658: Export control rule on advanced computing for China (2022-10-13) https://www.federalregister.gov/documents/2022/10/13/2022-21…
  6. FR 2023-23055: Controls tightened, A800/H800 brought under control (2023-10-25) https://www.federalregister.gov/documents/2023/10/25/2023-23…
  7. CRS R48642: U.S. Export Controls and China: Advanced Semiconductors (Export Control Timeline) https://www.congress.gov/crs-product/R48642
  8. China's military and government acquire Nvidia chips despite US ban (2024-01-14, gray-market circulation account) https://www.reuters.com/technology/chinas-military-governmen…
  9. H100 vs A100 comparison (early-2024 A100 full-lineup EOL notice, channel-reported account) https://amaxai.ghost.io/nvidia-h100-vs-nvidia-a100
  10. Semiconductor export controls: What chip smuggling reveals (2026, gray market and smuggling observations) https://www.imd.org/ibyimd/geopolitics/the-long-way-to-china…
  11. ChatGPT Hardware: A Look at 8x NVIDIA A100 Systems (8×A100 system roundup) https://www.servethehome.com/chatgpt-hardware-a-look-at-8x-n…
  12. H200 approved for China (2025-12-24, same account as H100 entry [9]) 
  13. Listing search — AIXX Exchange (Zero-commission Matching; no market snapshot for the A100 yet, pricing subject to the seller's quote) https://www.aixx.vip/hall.html
Versions and errata | This entry is maintained by the AIXX Pedia editorial team, AI-assisted drafting with human fact-checking. Updated 2026-10-09 · Version v1.0 · All revisions are logged and traceable. Found an error? Reach us via Corrections Channel ; corrections are published after verification and recorded in version history.

Video Overview VIDEO

This Library
Editorial PolicyAbout This Library (Disclosure of Interests)Corrections Channel
Editorial Constitution Summary
Every claim sourcedDrawbacks always stated · corrections publicly loggedNo paid entries acceptedZero traffic-funneling or sales elements within entriesMarket data attached only as data modules