AIXX Pedia › Model Entry › A100 80GB

A100 (Full name NVIDIA A100 Tensor Core GPU, part of the "Ampere" family) is the data center GPU NVIDIA announced at GTC on May 14, 2020 Data center GPU unveiled at GTC: the opening shot of the Ampere generation, debuting third-generation Tensor Cores (TF32 and structured sparsity) and MIG multi-instance partitioning (up to 7 instances per card)[1][4]; The 80GB version Announced on November 16, 2020, with HBM2e memory doubled and bandwidth exceeding 2TB/s (officially billed as the "world's fastest memory bandwidth")[2]. Available in both SXM and PCIe form factors with 40GB/80GB capacity options, it is the only "full OEM lineup"-level installed base in this library's Model Entries.
It was the "AI compute hard currency" of its generation, the one before H100: when ChatGPT ignited the global compute arms race, A100s powered the training clusters of every major player. It was also among the first batch of models locked down by the October 2022 US export controls on China — the China-market Variant A800 and the October 2023 tightening of controls form a complete policy timeline (see "History" and "Limitations & Controversies").
In the 2026 spot market, the A100's role is Installed-base continuation : The product line has entered end-of-life (channels received full-line EOL notices in early 2024, per channel accounts [9]); new cards via legitimate channels are essentially unavailable, and circulation consists mainly of retired machines, channel inventory, and secondhand units. The 80GB HBM2e still holds up in inference and traditional HPC scenarios, but the memory-generation gap versus the H200 (141GB HBM3e) and B300 (288GB HBM3e) is plainly visible. This entry carries no market-rate band — the A100 no longer has a unified market rate, actual price subject to the seller's quote 。
AIXX Index (0–100): this library estimates via publicly available specs, weighted — memory 40% + interconnect 30% + ecosystem 30%, adjusted per use case, with an EOL status correction applied. 90+ flagship-grade · 75+ Excellent · 60+ usable · below 60 not applicable. The methodology is transparent and reproducible, and does not constitute a performance guarantee.
announced at GTC on May 14, 2020 , NVIDIA unveiled the Ampere architecture and the A100 (40GB version launched first) at GTC: third-generation Tensor Cores brought TF32 and structured sparsity to data center GPUs for the first time, and MIG carved a single card into up to 7 instances with QoS guarantees; the DGX A100 announced the same day pushed 8-card systems into AI data centers[1][4].
On November 16, 2020 , the 80GB version was announced: HBM2e capacity doubled, bandwidth exceeded 2TB/s, and 8-card systems totaled 640GB of memory[2]; the PCIe version rolled out shortly after. Over the following year-plus, the HGX A100 8-card system became the standard form factor for global AI compute expansion.
In August–October 2022 , U.S. export controls on China took effect: A100/H100 exports to China required licenses, with the formal rules effective October 13, 2022[5][7]; NVIDIA promptly launched the China-market Variant A800 (with reduced Interconnect Bandwidth to stay under thresholds), which became the mainstay model in mainland China's market through 2022-2023 (per public reporting[7]).
In October 2023 Controls tightened, and the A800/H800 were likewise placed under license management; China-bound demand subsequently shifted to the H20/L20/L2 China-market Variant line (per public reporting from November 2023[7]). The A100 itself remained on the control list throughout and never returned to the list of approved exports to China.
2024–2026 , the product line entered its final phase: the channel received EOL notices for the entire A100 lineup in early 2024 (per channel-relayed reports[9]); installed-base machines and retired data center units became the mainstay of the spot market, with gray-market and smuggling cases involving high-end GPUs appearing in public reporting[8][10]. After the H200 was approved for China in December 2025 (per public reporting[12]), the generational handover accelerated further.
| Item | Specifications (A100 80GB · official figures; SXM / PCIe listed separately where applicable) |
|---|---|
| GPU Core | NVIDIA Ampere GA100 |
| Board Memory | 80GB HBM2e (same capacity on SXM and PCIe; a 40GB version also exists) |
| Memory Bandwidth | 2,039GB/s(SXM)/ 1,935GB/s(PCIe) |
| FP64 / FP64 Tensor Core | 9.7 / 19.5 TFLOPS |
| FP32 | 19.5 TFLOPS |
| TF32 Tensor Core | 156 TFLOPS (312 sparse) |
| BF16 / FP16 Tensor Core | 312 TFLOPS each (624 sparse) |
| INT8 Tensor Core | 624 TOPS (1248 sparse) |
| GPU-to-GPU Interconnect | NVLink 3rd generation · 600GB/s (NVSwitch full mesh on HGX baseboards; 600GB/s dual-card via bridge on PCIe) |
| Host Interface | PCIe Gen4 · 64GB/s |
| Board Power (TBP/TGP) | SXM 400W (up to 500W for the HGX custom thermal CTS SKU, official footnote) / PCIe 300W |
| Multi-instance partitioning | MIG up to 7 instances @ 10GB (per-instance memory doubled on the 80GB version) |
| Mainstream System Form Factors | HGX A100 4/8/16-GPU baseboards · DGX A100 8-GPU · partner 1-8 GPU appliances |
| Previous Generation / Competing Product | V100 / H100, A800 (China-market Variant derivative) |
Specifications per NVIDIA's official product page (verified 2026-10)[1]; "sparse" figures are the officially asterisked structured-sparsity numbers—dense performance is half; CTS (Custom Thermal Solution) is per the official footnote for the HGX A100-80GB.
| Item | A100 80GB | H100 80GB | H200 | B300 |
|---|---|---|---|---|
| Board Memory | 80GB HBM2e | 80GB HBM3 | 141GB HBM3e | 288GB HBM3e |
| Memory Bandwidth | ~2TB/s | 3.35TB/s | 4.8TB/s | ~8TB/s |
| Flagship precision | FP16 (TF32 + sparsity debuted here) | FP8(Transformer Engine) | FP8 | FP4 |
| GPU-to-GPU Interconnect | NVLink 3 · 600GB/s | NVLink 4 · 900GB/s | NVLink 4 · 900GB/s | NVLink 5 · 1.8TB/s |
| One-line buying advice | Installed-base continuation · mostly second-hand | Budget ceiling · largest ecosystem | Large memory · volume mainstay | Flagship new purchase · next generation |
Specifications per NVIDIA's official public materials[1]; see the respective entries for H100/H200/B300 comparisons.
The A100 family splits into four branches by memory capacity and form factor, plus the China-market Variant A800; 2026 spot circulation is dominated by the 80GB version (SXM/PCIe) and retired units:
The A100's cooling form factor is stated plainly in the official spec sheet: the SXM version runs 400W passive cooling , with heat removed through the chassis airflow of the HGX baseboard system (the official footnote for the HGX A100-80GB Custom Thermal Solution CTS SKU supports up to 500W[1]); the PCIe version is 300W dual-slot air-cooled card , and an official single-slot Liquid-cooled variant is also available[1]. What this means for buyers: SXM systems (DGX/HGX) require whole-rack planning of data center power and airflow, while the PCIe card is the lowest-friction path for adding GPUs to an older facility.
MIG is A100's deployment legacy that still matters today: a single card can be split into up to 7 10GB instances, each with QoS guarantees, and combined with Kubernetes and container orchestration (per official pages[1]), small teams can carve one retired A100 among multiple inference services—one reason it still finds buyers on the second-hand market.
| Model / Scenario | Memory requirements (FP16 estimates) | A100 deployment (8 GPUs, 640GB) | AIXX Index |
|---|---|---|---|
| DeepSeek R1 full (671B) | FP16 ~1.3TB / FP8 ~690GB | Does not fit — the A100 also lacks FP8, and eight GPUs in FP16 provide only 640GB; evaluate cross-node deployment or Quantization separately | 38 |
| 70B-class open models | FP16 ~140GB | Won't fit on a single 80GB card; start with dual-card tensor parallelism; borderline on one card after INT8 Quantization (KV cache needs careful budgeting) | 70 |
| 7B–14B class | FP16 ~14–28GB | Comfortable on one card; batch pipelines rely on MIG slicing or multi-card concurrency | 88 |
| Scientific computing / FP64 simulation | Depends on mesh size | FP64 Tensor at 19.5 TFLOPS + 80GB memory — the A100's traditional stronghold | 85 |
Memory estimated as FP16 weights ≈ parameter count × 2 bytes (estimated; KV cache and activation headroom not included); the A100 does not support FP8 — pipelines migrating to FP8 should go straight to the H100/H200. The AIXX Index reflects this library's estimates and is updated with measured data.



Actual photos are added continuously as inspection batches are stocked; AI-generated images are never passed off as real photos.
| Item | Requirements / Status |
|---|---|
| CUDA | Ampere supported from 11.0 (launch release), full coverage in the current 12.x |
| Driver | From the 450 series (launch), ongoing driver compatibility |
| Training frameworks | PyTorch / TensorFlow officially support Ampere — one of the most mature ecosystem generations |
| Inference engines | vLLM / SGLang / TensorRT all supported, but H100 has taken over as the reference machine in public benchmarks |
| MIG support | Works with Kubernetes and container orchestration (per the official page), a mature multi-tenant partitioning solution |
| Operating system | Mainstream Linux distributions (Ubuntu 20.04+ and similar) |
The Ampere ecosystem is extremely mature after six years, with the best legacy codebase compatibility; software stack versions evolve over time — defer to NVIDIA's official releases. Post-EOL driver and security update cadence should be confirmed with the OEM/channel before purchase.
Three inspection checkpoints when buying an A100:
The complete six-item burn-in test criteria (values anchored to the A100) are in this entry "How to Stress-Test" section.
Six-item Burn-in Test criteria, all value benchmarks anchored to the A100: unboxing identification → single-card Burn-in Test (SXM 400W / PCIe 300W, ≤85℃ with zero ECC errors = Pass) → full-system Full Load → memory bandwidth (SXM rated 2,039GB/s, ≥85% = Pass) → Interconnect Bandwidth (NVLink rated 600GB/s, nccl-tests ≥500GB/s) → inference throughput (≥80% of public benchmarks).
On the same HGX A100 baseboard, OEM systems differ in form factor, cooling, and service; the 8×A100 system roundups from the ChatGPT compute boom (Supermicro / Inspur / ASUS / Dell / Gigabyte) serve as a form-factor reference for installed-base machines[11]:
| System Vendor | Representative Form Factor | Differentiators | Status as of 2026 |
|---|---|---|---|
| Supermicro | HGX A100 8-GPU appliance (Air-cooled / Liquid-cooled) | Volume mainstay, full range of form factors | Installed base and retired unit circulation |
| Dell | PowerEdge line (HGX A100 8) | Tier-one global service network | Installed-base Circulation · Depends on Service Contract |
| Inspur | NF5488A5 and others (HGX A100 8) | Common in Asia-Pacific and domestic projects, with full reviews from professional media | Mainstay of the domestic installed base |
| Gigabyte | HGX A100 8 complete system | Flexible configurations, strong APAC channel presence | Installed-base Circulation |
| NVIDIA official | DGX A100 (8-GPU system) | Official turnkey delivery with full-stack software and OEM backing | EOL · OEM channel winding down |
OEMs' current flagship lines have moved to Hopper/Blackwell platforms; A100 systems now circulate mainly as installed-base and retired units. Refer to official vendor announcements for specific models[11].
The enhanced second generation of high-bandwidth memory. The A100 80GB carries 80GB of HBM2e per GPU with 2,039GB/s SXM bandwidth—HBM2e is also where the A100 falls a generation behind its successors: starting with the H100, HBM3/HBM3e more than doubles both capacity and bandwidth.
A first on the A100: a single GPU can be partitioned into up to 7 instances, with up to 10GB of memory per instance on the 80GB version, each fully isolated with QoS guarantees. A practical feature for multi-tenant inference and small-model cloud production; whether MIG partitions correctly should also be part of acceptance testing.
Third-generation NVLink delivers 600GB/s per GPU; the SXM4 mezzanine package (GPUs soldered onto the HGX baseboard) with NVSwitch enables full 8-GPU interconnect; the PCIe version offers only dual-GPU 600GB/s via bridge—interconnect topology is the core of the SXM vs PCIe price gap.
Two precision technologies introduced with the A100: TF32 speeds up single-precision training without code changes; structured sparsity (officially marked with an asterisk) doubles peak throughput, but requires model pruning—dense throughput is halved—so always ask whether figures are sparse or dense when reading spec sheets.
The A800 is a China-market Variant of the A100 (with downgraded interconnect bandwidth to meet the October 2022 control thresholds); after the October 2023 tightening it was brought under control along with the A100. Batch and customs routing affect warranty and resale value—always check during acceptance; all statements here reflect publicly reported accounts and do not constitute legal advice.
The A100 has reached the end of its product line (EOL per channel reports[9]); the spot market consists mainly of installed-base machines, retired units, and channel inventory, with condition, warranty, data center duty history, and channel terms driving extreme price dispersion—there is no verifiable unified market rate, AIXX Pedia honesty principle: no market band; prices are subject to the seller's quote 。
Spot search: AIXX Exchange Hall › (Zero-commission Matching; no involvement in transactions; no knowledge of or speculation on transaction prices — hence data neutrality). This section will switch to a standard market band once enough snapshots accumulate.
It depends on price and warranty: for inference (especially 7B–14B-class and MIG-sliced multi-tenant workloads) and traditional HPC/FP64 scenarios it still holds up, and the Ampere ecosystem remains among the most mature of any generation; but the product line is EOL (channel-reported), making warranty, spare parts, and resale value hard constraints. If budget allows or you need an FP8 production line, go straight to the H100/H200.
Both start at 80GB, but a full generation apart: HBM2e at ~2TB/s versus HBM3 at 3.35TB/s, NVLink 600GB/s versus 900GB/s, FP64 Tensor 19.5 versus 67 TFLOPS—and the H100 debuted FP8/Transformer Engine—training and inference efficiency are a generation apart. The A100's unique turf is its mature ecosystem and used-market price gap.
The A100 has been under US export controls for China since October 2022, with the China-market Variant A800 brought under control in October 2023 as well; no new cards are publicly sold through legitimate mainland channels, and spot circulation consists of installed-base units and gray-market channels. This reflects publicly reported accounts and does not constitute legal advice; before purchasing, defer to regulator policies and professional compliance advice.
nvidia-smi settles it in one shot: A100-SXM4-80GB / A100-PCIE-80GB are directly distinguishable by name from the 40GB version; then cross-check with silkscreen, official firmware reports, and measured memory testing—the three-piece verification kit; photos alone are unreliable (see "Procurement & Inspection" and "How to Stress-Test").
The A100 has no display outputs and poor mining economics for compute cards—it was never a mining mainstay, so the "no mining" question has limited meaning; the real risks are 7×24 high-load aging in data centers and decommissioned-unit refurbishment. The right approach for buying used: ask about data center load history and power-on hours, verify post-EOL warranty status, and run the six-item stress test (measured memory and Interconnect Bandwidth are the priorities).