AIXX Pedia › Model Entry › H800

H800 It is the China-market variant of the NVIDIA H100 China-compliant derivative of the NVIDIA A100 : first disclosed to the market on March 21, 2023 as adjusted for the Chinese market — the Hopper-generation core architecture was retained (4th-gen Tensor Core, 14592 CUDA cores, PCIe Gen5), and the key difference is that the GPU-to-GPU interconnect was cut from the H100's 900GB/s to 400GB/s Based on export control threshold compliance (per public reports and official spec documents [1][2]).
. It later proved to be the most important card in the history of Chinese AI training : From 2023 to 2024, the explosive training demand for Chinese domestic large models largely ran on H800 — DeepSeek and others have publicly disclosed that their training compute included H800 (per public reports); after the October 2023 tightening of controls, the H800 was brought under licensing as well (per CNBC reports [3]), shifting into the Installed-base Circulation — in the 2026 spot market, the H800 is one of the most sought-after Hopper-compliant training cards and one of the hardest currencies with the firmest pricing (per this database's inspection experience).
. The H800 ships in two versions: 80GB HBM2e (2TB/s) and 94GB HBM3 (3.9TB/s) (per official spec documents [1]). Three things to check before buying an H800: tell the versions apart (the price gap between the two versions is large — one nvidia-smi check settles it), Test the interconnect tier on the spot (the 400GB/s signature — guard against bait-and-switch), and Batch compliance documentation (supply paths differ before and after the Oct-2023 licensing). This entry carries no market-quotes section — actual price subject to the seller's quote.
AIXX Index (0–100): estimated in this library via a weighted formula based on public specs — memory 40% + interconnect 30% + ecosystem 30%, with an installed-base status adjustment on top.
March 21, 2023 , first disclosed to market: NVIDIA adjusted its flagship H100 for the Chinese market as the H800 — Hopper core architecture retained, interconnect downgraded to meet the Oct-2022 control thresholds.
In 2023 , workhorse of domestic large-model training: the H800 shipped in volume with the LLM construction wave, becoming the publicly disclosed training compute for leading models (same class as DeepSeek, per public reporting); both versions (80GB HBM2e / 94GB HBM3) circulated in parallel.
In October 2023 , control escalation: the Oct 25, 2023 rules brought the H800 and A800 under licensing together — the China-market Variant line tightened across the board, and the H800 moved from new stock into installed-base hard currency.
2024–2026 , installed-base hard-currency era: H800 used and installed-base channel pricing has held firm — backed by the triple halo of "Hopper training power + compliant status + DeepSeek endorsement"; from 2025 onward, successors like the H20 diverted new demand, but installed-base H800 training clusters remain in their service prime (per this library's compilation). Cross-border trade policy is still evolving; this library's statements reflect public reporting and do not constitute legal advice.
| Item | Specs (H800 · per Lenovo official spec documents; dual-version splits noted) |
|---|---|
| GPU architecture | NVIDIA Hopper |
| Board Memory | 80GB HBM2e / 94GB HBM3 dual versions · ECC |
| Memory Bandwidth | 2TB/s (80GB version) / 3.9TB/s (94GB version) |
| FP32 | 51 TFLOPS (dual-source-consistent; other precision-tier compute rows show source misalignment, so this entry omits the whole group and makes no claims) |
| Tensor Core | 456 4th-gen Tensor Cores / GPU |
| CUDA cores | 14592 FP32 CUDA cores / GPU |
| GPU-to-GPU Interconnect | NVLink 400GB/s (vs. 900GB/s for the H100, per public reports [2]) |
| Host Interface | PCIe Gen5 x16 |
| Form Factor | PCIe full-height, full-length, dual-slot |
| Multi-instance partitioning | MIG up to 7 instances (80GB version 10GB/instance · 94GB version 13GB/instance) |
| Power / Cooling | 350W · passive cooling |
| ECC | Supported |
| Launch | In 2023 |
Specs per official documents from authorized partners; "Tensor Core/CUDA core counts" are OEM datasheet figures. Other precision-tier compute figures were dropped as a group due to suspected source misalignment — better missing than wrong.
| Item | A800(2022) | H800(2023) | H20(2024) |
|---|---|---|---|
| Architecture | Ampere | Hopper | Hopper (trimmed) |
| Memory | 80GB HBM2e | 80GB HBM2e / 94GB HBM3 | 96GB HBM3 |
| Interconnect downgraded | NVLink 400GB/s | NVLink 400GB/s | NVLink trimmed |
| Date placed under controls | 2023-10 | 2023-10 | Tightening from 2025 (per public reporting) |
| One-line buying advice | Ampere installed-base mainstay | Training hard currency | Inference-oriented compliant card |
See the A800 entry for details; H20 behavior per public reporting; control status subject to competent-authority policy, not legal advice.
The H800 splits into two branches by memory version (the same card in two versions is a market form unique to the H800):
The H800 is a PCIe full-height, full-length, dual-slot passive card (350W), relying on forced chassis airflow — the 350W power tier demands stricter airflow than the 300W-class A800 PCIe, so verify chassis Air-cooled capacity and slot spacing before deployment. MIG partitioning (up to 7 instances) is a practical deployment lever: the 94GB version offers 13GB per instance, the 80GB version 10GB, allowing multi-tenant inference pools to allocate at instance granularity (per official spec documents [1]).
Pre-deployment checks for used H800s: originality and condition of the heatsink and thermal pads (heatsink differences in the 350W class directly affect Full Load temperatures), PCIe Gen5 slot direct-attach topology (bandwidth suffers through a switch), and 8-pin power cable specs (per this library's inspection experience).
| Model / Scenario | Memory requirements (FP16 estimates) | H800 deployment reference | AIXX Index |
|---|---|---|---|
| DeepSeek R1 full (671B) | FP16 ~1.3TB / FP8 ~690GB | Fits in eight cards (FP8 terms) — 94GB×8=752GB or 80GB×8=640GB requires an FP8/INT8 Quantization path; the Hopper 4th-gen Tensor Core supports FP8 | 82 |
| 70B-class open models | FP16 ~140GB | Dual-card tensor parallelism; borderline on a single card after INT8 Quantization (the 94GB version has more headroom) | 82 |
| 7B–14B class | FP16 ~14–28GB | Comfortably single-card; MIG slices or multi-card concurrency stacking | 88 |
| Trillion-Parameter MoE Training | Multi-node, multi-cluster | NVLink 400GB/s in-rack + IB fabric across racks — the interconnect is the planning focus for large-scale expansion | 74 |
Memory estimated as FP16 weights ≈ parameter count × 2 bytes (estimated, excluding KV cache); FP8 support = Hopper 4th-gen Tensor Core architectural capability (per public architecture documentation); actual deployment precision strategy depends on the framework.

| Item | Requirements / Status |
|---|---|
| CUDA | Same generation as H100 (Hopper · compute capability 9.0) — full Hopper ecosystem coverage |
| Driver | Shares the driver line with H100 — current drivers continue to support it |
| Frameworks | Full support in PyTorch / TensorFlow / vLLM / TensorRT (Hopper terms, FP8 included) |
| MIG support | Mature Kubernetes/container-orchestration multi-tenant slicing |
| Training framework fit | High validation from public training cases like DeepSeek — a mature Hopper training stack (per public reporting) |
The H800 software ecosystem is shared with its generation-mate H100 — framework compatibility is the foundation of its status as training hard currency; defer to official NVIDIA releases.
Three inspection points when buying an H800:
For the full six-test verdict framework see this entry "How to Stress-Test" section.
Six-item stress-test protocol, all value judgments anchored to the H800: unbox and identify → single-card Burn-in Test (350W) → whole-machine Full Load → memory bandwidth (80GB version 2TB/s / 94GB version 3.9TB/s, ≥85% Pass) → Interconnect Bandwidth (NVLink 400GB/s tier, measured) → inference throughput.
The H800 circulates mainly as a single-slot PCIe card (no public SXM appliance offerings, per public sources); authorized-partner comparison:
| Channel | Reference Solutions | Differentiators | Status as of 2026 |
|---|---|---|---|
| NVIDIA original PCIe | H800 80GB / 94GB PCIe | The only two versions in spot circulation | Used and inventory in parallel |
| Lenovo | ThinkSystem H800 PCIe Gen5 integrated offering | Factory-integrated system, unified firmware warranty | Pulled units and project circulation |
| Cross-channel reference | Third-party spec database figures[5] | Circulation Reference | Circulation Reference |
Channel configurations are subject to the manufacturers' official documentation[1][5].
A market form unique to the H800: 80GB HBM2e (2TB/s) and 94GB HBM3 (3.9TB/s) circulating in parallel — the 94GB version nearly doubles bandwidth and is preferred for large KV caches and long contexts; price gap subject to actual price subject to the seller's quote.
The H800's compliance identity signature: GPU-to-GPU interconnect cut from the H100's 900GB/s to 400GB/s (per public reporting) — measuring the tier is a bidirectional inspection method (guards against an H800 posing as an H100, and against H100 leftovers sold as H800s).
The Hopper architecture's 456 4th-gen Tensor Cores support FP8 — the throughput engine for large-model training/inference; the H800 retains this (the interconnect downgrade doesn't touch the compute architecture), and the FP8 path is its technical backbone for carrying the training flag.
DeepSeek's publicly disclosed training compute included the H800 (per public reporting) — "a publicly validated training card" is the market-psychology basis for the H800's used-market premium; purchasing decisions should still rest on real-machine stress tests.
The new rules of 2023-10-25 brought the H800 under license management — circulation since then falls under the Installed-base Circulation and existing channels (per public reports [3]); verifying batch compliance documentation is the baseline for secondhand transactions. This database does not constitute legal advice.
H800 remains one of the most resilient hard assets in the installed-base market, but version (80/94GB), condition, batch, and channel terms create wide price dispersion — without a verifiable unified market feed, AIXX Pedia honesty principle: no market band; prices are subject to the seller's quote 。
Spot search: AIXX Exchange Hall › (zero-commission matching, no participation in transactions, hence neutral data). This section will switch to the standard market band once sufficient market snapshots accumulate.
The core difference is the interconnect: the H800's NVLink runs at 400GB/s (compliant downgrade for the China market), while the H100 offers 900GB/s — the compute architecture is the same generation (fourth-gen Tensor Core and FP8 are both present). Single-card inference gaps are small, but collective communication efficiency in multi-card training drops a tier.
The 94GB HBM3 version delivers 3.9TB/s bandwidth, roughly twice that of the 80GB version: for long context, large KV cache, and large-model training, the 94GB is preferred; the 80GB version has a larger installed base and wider channels, offering better value when budget-sensitive — actual price subject to the seller's quote.
The H800 has been under license control since October 2023; legitimate new supply has narrowed, and spot units come from Installed-base Circulation — it remains one of the most resilient Hopper hard assets on the secondhand market. Verifying compliance documentation is the baseline; this entry does not constitute legal advice.
In FP8, yes: full R1 in FP8 weighs about 690GB; an eight-card 94GB setup offers 752GB, while eight 80GB cards give 640GB — the 94GB setup has comfortable headroom, while the 80GB setup is borderline and requires careful Quantization and KV cache strategies. Native FP8 on fourth-gen Tensor Core is the foundation.
No — and mining isn't the real concern anyway: the H800 has no display output and wasn't used for crypto mining. The real risk is wear from 7×24 high-load LLM training. Best practice: ask about the datacenter's load history, export ECC logs, and run the six-point stress test (memory bandwidth and interconnect tier measurements are key).