Overview OVERVIEW
Intel Gaudi 3 Intel's third-generation data center AI accelerator line (released April 2024, shipped in the second half of the same year · per official statements):
FP8 1835 TFLOPS 、 128GB HBM2e · 3.7TB/s , on-card 24× 200GbE Ethernet RDMA, OAM form factor
900W (official statements). Its differentiating core is Ethernet-based scale-out interconnect —using standard Ethernet stacks for cluster expansion, a distinct path from NVLink's proprietary interconnect (architectural perspective). Positioned against NVIDIA H100 (see comparison table for Intel's official figures).
History HISTORY
- 2022-2023 : Gaudi 2 shipped at scale (Habana Labs line · official statements).
- 2024-04 : Gaudi 3 launched (Intel Vision · official statements); OAM/PCIe dual form factors shipped in the second half of the year.
- 2024-2025 : OEM integration and shipment by Dell/Supermicro and others (channel perspective).
- 2025-01 : Intel canceled the Falcon Shores discrete product plan (public reporting)—Gaudi 3 became the final third-generation product of the line; software stack evolution follows Intel's current roadmap.
Gaudi Generational Comparison GENERATIONS
| Dimension | Gaudi 2 (previous generation · official statements) | Gaudi 3 (this entry · official statements) |
| FP8 Compute | 432 TFLOPS(MHE) | 1835 TFLOPS(MHE) |
| BF16 | 216 TFLOPS | 735 TFLOPS |
| Memory | 96GB HBM2e · 2.45TB/s | 128GB HBM2e · 3.7TB/s |
| Interconnect | 21× 100GbE(RoCE) | 24× 200GbE(RoCE/RDMA) |
| Power (OAM) | 600W-class | 900W |
Scope: all figures are Intel's official release statements (verified 2026-11). MHE = Matrix Heavy Engine compute basis; power figures are for the OAM form factor and differ for PCIe.
Technical Specifications SPECS
| Item | Specifications (Intel official statements) |
| FP8 | 1835 TFLOPS (MHE · official statements) |
| BF16 | 735 TFLOPS (official statements) |
| Memory | 128GB HBM2e · 3.7TB/s (official statements) |
| Interconnect | 24× 200GbE integrated NICs · RoCE/RDMA scale-out (official statements) |
| Form factor | OAM (900W) / PCIe dual form factors (official statements) |
| Software stack | SynapseAI · oneAPI · PyTorch/Vision support (official statements) |
| OEM Integration | Dell / Supermicro / Inspur and others (public channel information) |
Model Fit MODEL FIT
| Use cases | 128GB HBM2E capacity guidance (estimated: weights × precision + KV/framework overhead) |
| 70B-class inference | FP8 Quantization fits full model; FP16 full model is close to the limit (estimated) |
| Hundred-billion-class quantization | INT4/FP4 quantization fits on a single card (estimated) |
| Cluster Training | Ethernet RoCE scale-out—cluster training on a general-purpose network stack (architectural perspective) |
| Ecosystem Caveat | The SynapseAI stack is not structurally equivalent to CUDA—assess migration costs per project (ecosystem perspective) |
Limitations and Boundaries LIMITS
- Ecosystem Gap : under CUDA's dominance, SynapseAI's support surface and community resources are smaller (ecosystem perspective)—factor software stack maturity into selection decisions.
- Roadmap Uncertainty : after Falcon Shores' cancellation, the roadmap follows Intel's current statements (public reporting)—long-term investment requires evaluation.
- Power Threshold : OAM 900W—plan power/cooling to OAM standards in advance (deployment perspective).
FAQ FAQ
How does Gaudi 3 compare against the H100?
Per Intel's release statements: FP8 1835 TFLOPS (H100 roughly 1979 on the same basis · official page) is close, 128GB HBM2e memory exceeds the H100's 80GB, and interconnect uses 24× 200GbE Ethernet RDMA (the H100 uses NVLink)—Ethernet scale-out is Gaudi's differentiating core; actual throughput varies with software stack maturity (media benchmark results vary).
What's the thinking behind Gaudi 3's Ethernet interconnect?
Official statements: on-card 24× 200GbE—scale-out via standard Ethernet (RoCE/RDMA), no proprietary interconnect hardware, common network stack at scale—this is a distinct path from NVLink's proprietary high-speed domain; the ecosystem is compatible with standard Ethernet operations (architectural perspective).
What's the current state of the Gaudi line?
Public reporting: in early 2025 Intel canceled the successor Falcon Shores discrete product plan and shifted its data center AI strategy—Gaudi 3 is the line's third-generation discrete product, on sale through OEM channels (Dell/Supermicro, etc.); verify current supply and software stack roadmap before purchasing.
References REFERENCES
- Intel: Gaudi 3 launch release and product page (2024-04 · official statements verified 2026-11) · Original
- Intel: Habana Gaudi product line documentation · Original