Overview OVERVIEW

The liquid cooling loop is the coolant circulation path of a liquid cooling system — divided into a primary loop (facility cooling water side) and a secondary loop (IT equipment coolant side). Coolant leaves the CDU (Coolant Distribution Unit), is routed through manifolds to the cold plates in each server, absorbs heat, and returns to the CDU for heat exchange — forming a closed circuit. Loop design (serial/parallel, pipe diameter/flow rate/temperature differential) determines cooling efficiency.

For AI racks (NVL72 and the like), the liquid cooling loop is the core engineering challenge of deployment: the sealing of quick disconnects and cold plates on the secondary side, the supply water temperature and flow rate on the primary side, and air bubble removal in the loop — each affects cooling efficiency and reliability. Acceptance testing of the loop (pressure/leak testing + temperature measurement + flow measurement) is a mandatory procurement check.

Key Figures KEY NUMBERS

ItemValue / Basis
Primary loopFacility cooling water ↔ CDU
Secondary loopCDU ↔ Cold plates (in-rack)
CoolantDeionized water / glycol solution / dielectric fluid
Mandatory acceptance checksPressure/leak test · Temperature measurement · Flow measurement

What It Means on the B300 ON B300

In GB200/GB300 NVL72 fully liquid-cooled racks, the secondary loop covers 18 compute trays plus 9 NVSwitch trays — cold plates blanket the GPU/CPU/NVSwitch chips. Loop sealing is the biggest risk point: any leaking quick disconnect becomes an incident at Full Load. Acceptance criteria: pressure/leak test + 24-hour static observation.

Boundaries and Caveats LIMITS

  • Leaks are the original sin of liquid cooling: every liquid cooling system carries leak risk — negative pressure schemes, leak detection ropes, and redundancy are mitigation measures, not elimination.
  • Water quality management is a long-term commitment: corrosion, scaling, and microbial growth span the entire system lifecycle — systems without proper water quality management lose heat exchange efficiency year over year.
  • High retrofit barrier: bringing liquid cooling into an Air-cooled data hall requires reworking the cooling water system — the engineering effort and budget far exceed the equipment cost itself.

Video Overview VIDEO

References REFERENCES

  1. NVIDIA official site — Blackwell Ultra / HGX B300 product page https://www.nvidia.com/en-us/data-center/hgx/
  2. Market and Sales Data: AIXX Exchange (Market data section of this library)
Versions and errata | This entry is maintained by the AIXX Pedia editorial team, AI-assisted drafting with human fact-checking. Updated 2026-10-20 · Version v1.0 · All revisions are logged and traceable.
This Library
Editorial PolicyAbout This Library (Disclosure of Interests)Corrections Channel
Editorial Constitution Summary
Every claim sourcedDrawbacks always stated · corrections publicly loggedNo paid entries acceptedZero traffic-funneling or sales elements within entriesMarket data attached only as data modules
AIXX Family
AIXX PediaAIXX ExchangeAIXX News
Market data source: AIXX Exchange · © 2026 AIXX Pedia · An AIXX Product