SECTIONS
EDITIONS
NETWORK
AIXX Pedia The encyclopedia of compute hardware

AIXX Pedia › Model Entry › L40S

NVIDIA L40S official image (vendor image)
Vendor Image · AIXX Pedia (NVIDIA official site)

L40S

NVIDIA Ada Lovelace · 48GB dual-purpose inference/rendering · Model Entry #011

Overview OVERVIEW

L40S is built on the NVIDIA Ada Lovelace architecture as a dual-slot PCIe data center GPU : 48GB GDDR6 ECC, FP8 Tensor Core 1,466 TFLOPS (sparse), FP32 91.6 TFLOPS, in a 350W dual-slot passive form factor. NVIDIA positions it as a "dual-purpose card for both rendering and inference" :graphics (3×NVENC/3×NVDEC with AV1, 212 TFLOPS RT Core) and AI inference (FP8/INT8) all in one machine (per NVIDIA official specs[1]).

Its popularity in the China spot market is easy to explain: 48GB large VRAM + PCIe plug-and-play + no NVLink resources consumed —no HGX baseboard, no custom server needed; just plug it into an ordinary 2U server and it runs 70B-class quantized inference and SD/video generation pipelines. It was one of the highest-volume data center cards on the inference side from 2024 to 2026 (per this library's inspection experience), and one of the best solutions for hybrid "AI inference + render farm + video transcoding" workloads.

Three things before buying an L40S: Price gap check vs. L40/L40S (2 TFLOPS FP32 difference and 50W TDP difference — the price gap should match), 16-pin power adapter cable (older PSUs need a compliant adapter), Secure Boot and NEBS certification status (a hard requirement for enterprise compliance scenarios, per official specs[1]). This entry carries no market strip—actual price subject to the seller's quote.

Use Cases FIT

AIXX Index (0–100): weighted estimate by this library based on public specs — VRAM 40% + interconnect 30% + ecosystem 30%, weights adjusted by use case.

AI Inference Services 88AIXX Index
48GB + FP8 1,466 TFLOPS: the value workhorse for 70B-class quantized inference and SD/video generation pipelines — PCIe plug-and-play is the biggest deployment advantage.
Video transcoding / streaming 90AIXX Index
3×NVENC + 3×NVDEC with AV1 encode/decode — the compute foundation for large-scale cloud gaming, live streaming, and VOD transcoding pipelines.
3D Rendering / Omniverse 88AIXX Index
212 TFLOPS RT Core + 4th-gen Tensor Cores—covering DCC content creation, offline rendering and digital twins alike (per official positioning[1]).
Large model training 45AIXX Index
No NVLink, no MIG — on the training side it lacks both interconnect and partitioning; L40S isn't meant for training, so don't misplace it in your selection.

History HISTORY

In 2023 , the L40S launches: an upgraded take on the Ada Lovelace-based L40—91.6 TFLOPS FP32 (vs. 90.5 on the L40), the same 48GB GDDR6 and 3×NVENC/3×NVDEC, positioned squarely as a dual-role part for "generative AI inference + graphics" (per NVIDIA official specs and product-line info[1][2]).

2024 , peak inference volume: generative AI inference demand exploded, and L40S became a volume leader on the inference side with its "48GB + PCIe plug-and-play" combination — video generation pipelines (SD/KeLing-type), large-model quantized inference, and transcoding farms advancing in parallel (per this library's compilation).

2025-2026 , spot-market mainstay status continues: the newer RTX 6000 Ada (workstation line) and L40 (original) circulate in parallel; L40S maintains its inference-side sweet spot for price-performance thanks to FP8 and NEBS certification. The subsequent Ada successor line evolves with NVIDIA's public roadmap. Cross-border circulation policies are still evolving; at procurement, defer to competent authority policies and professional advice (public reporting basis).

Technical Specifications SPECIFICATIONS

ItemSpecs (NVIDIA L40S · official)
GPU architectureNVIDIA Ada Lovelace
Board Memory48GB GDDR6 with ECC
Memory Bandwidth864GB/s
CUDA / Tensor / RT Cores18,176 CUDA · 568 fourth-gen Tensor Cores · 142 third-gen RT Cores (RT performance 212 TFLOPS)
FP3291.6 TFLOPS
TF32 Tensor183 TFLOPS (366 sparse)
BF16 / FP16 Tensor362.05 TFLOPS (733 sparse)
FP8 / INT8 Tensor733 TFLOPS (1,466 sparse)
Codecs3× NVENC | 3× NVDEC (with AV1 encode/decode)
Host InterfacePCIe Gen4 x16 (64GB/s bidirectional)
Power / Supply350W · 1× 16-pin
Form Factor4.4"(H) × 10.5"(L) dual-slot · passive cooling
Display output4× DisplayPort 1.4a
Security / CertificationSecure Boot with Root of Trust · NEBS Ready Level 3
MIG / NVLinkNo MIG support · no NVLink support (standalone PCIe card positioning)

Specs based on NVIDIA official snapshot (2026-10 baseline[1],verified item-by-item against the spec quick reference);「Sparse」denotes the official asterisk-marked figure; dense halved.

FP32 91.6 FP16 733* FP8 1,466*TFLOPS (sparse) L40S precision compute ladder (NVIDIA official, * = sparse)

L40 family comparison L40 FAMILY

ItemL40L40S (this entry)L40S vs L40 in one line
FP3290.5 TFLOPS91.6 TFLOPSFP32 one tier apart, 50W apart in power — the price gap should match. For inference, choose L40S; for pure rendering on a budget, look at the L40
Power300W350W
Memory48GB GDDR6 ECC48GB GDDR6 ECC

The L40 comparison uses the same official snapshot as this library's Spec Card; L40S's FP8/INT8 gains come from higher clocks and enhanced power delivery (same architecture).

Family Members FAMILY

Ada Lovelace data center cards are tiered by positioning; L40S sits in the inference/graphics dual-purpose tier:

L40S (48GB · FP8 dual-purpose flagship · this entry)L40 (48GB · original · rendering-oriented)L4 (24GB · 1U low-power inference · see Spec Card)RTX 6000 Ada (48GB workstation line · full display outputs)

Cooling & Deployment COOLING

The L40S is a dual-slot passive card measuring 4.4 inches tall × 10.5 inches long (350W, 1× 16-pin power) — passive cooling depends on forced server airflow; adding it to a tower workstation requires a blower fan solution. Three deployment checkpoints: Power (16-pin connector; older PSUs need compliant adapter cables; verify cable specs for 350W Full Load), Direct PCIe Gen4 slot connection (x16 direct to CPU, avoid switches that eat bandwidth), airflow (dual-slot passive cards are sensitive to chassis airflow; control intake temperature at 350W Full Load).

Multi-card deployment: 2U servers commonly run 2–4 cards; the airflow pressure of 1.4kW at 4-card Full Load needs careful calculation — no NVLink means multiple L40S cards form "parallel compute" rather than an "interconnected domain," fine for inference and rendering, unsuitable for training.

Model Compatibility MODEL FIT

Model / ScenarioMemory requirements (FP16 estimates)L40S deployment guideAIXX Index
70B-class quantized inferenceINT4/FP8 roughly 35–40GBRuns at the limit on a single 48GB card (tight KV cache); comfortable headroom with two cards84
SD / video generation pipelineFP16 8-24GBMultiple concurrent streams per card; FP8 keeps pipelines smooth88
Video transcoding farm— (codec workload)3×NVENC/3×NVDEC with AV1; an industry benchmark for transcoding density90
Large model training—No NVLink/no MIG — unsuitable for training (see A100/H100 entries)45

VRAM estimated as FP16 weights ≈ parameter count × 2 bytes (derived estimate, excluding KV cache); precision strategies for quantized deployment depend on the framework.

NVIDIA L40S official image (vendor image)
NVIDIA L40S · official image (NVIDIA website)

Software & Ecosystem ECOSYSTEM

ItemRequirements / Status
CUDAAda architecture (compute capability 8.9) — fully supported since CUDA 11.8, with full coverage in the current 12.x branch
FrameworksFull support across PyTorch / TensorFlow / vLLM (mature inference-side ecosystem)
Graphics stackFull Omniverse / DCC support — 4× DP 1.4a direct display output (rare for a data center card)
VirtualizationvGPU support (per RTX vWS/vPC licensing) — mature VDI and cloud workstation solutions
DriverNVIDIA data center driver line (shared with the A/H series)

The Ada ecosystem shares the CUDA mainline with Ampere; vGPU license types are procured per use case (official). Software versions evolve over time; refer to NVIDIA's official releases.

Purchasing & Inspection PROCUREMENT

Three inspection points when buying an L40S:

1
Distinguishing L40 fakes from L40S
nvidia-smi verifies the model, FP32 tier (91.6 vs. 90.5), and power tier (350W vs. 300W) — the two look nearly identical; software verification is the only reliable method.
2
Power and adapter cable check
16-pin adapter cables for older PSUs are wear items: verify the cable is original and check connector heating (measure during Full Load) — adapter cable failure is a common cause of L40S returns (per this library's inspection experience).
3
Codec test
Mandatory test for transcoding purchases: measured NVENC concurrent stream count and AV1 encode performance (ffmpeg-based tools) — codecs are one of L40S's core selling points; skipping the test is a wasted purchase.

For the full six-test verdict framework see this entry "How to Stress-Test" section.

How to Stress Test BENCH TEST

Six-item test protocol, all values anchored to actual L40S results: unboxing identification → single-card Burn-in Test (350W) → FP8/INT8 compute → codec concurrency → graphics rendering → long-duration stability Burn-in Test.

1
Unboxing & Identification
nvidia-smi: L40S model, 48GB VRAM, 350W tier — software-level distinction from the L40 (90.5/300W); cross-check silkscreen and part number.
2
Single-card Burn-in Test
350W Full Load Burn-in Test: temperature ≤85℃ and zero ECC errors = Pass (per case framework) — dual-slot passive cards are airflow-sensitive; test in the deployment orientation.
3
FP8/INT8 compute
Tensor benchmark measurement: FP8 dense 733 TFLOPS tier (≥80% = Pass, derived estimate) — the actual throughput anchor for inference production lines.
4
Codec concurrency
ffmpeg multi-stream concurrent transcoding test: NVENC stream count and AV1 encode performance — the core acceptance item for transcoding scenarios.
5
Graphics rendering
RT Core scene benchmark (Omniverse/professional rendering software): frame rate and stability meet target — mandatory for graphics purchases.
6
Extended Burn-in
≥2 hours sustained at Full Load (per case framework): stable temperature, zero error count growth — required before 7×24 duty in a transcoding farm.

Shipping & Delivery LOGISTICS

1
ESD protection and edge connector
Anti-static bag + cushioned packaging; dual-slot cards are heavy (large heatsink) — visually inspect edge connector wear and mounting hardware on arrival.
2
Cross-border compliance
L40S cross-border trade is affected by export control policy (Ada architecture data center cards fall within the scope of control lists, per public reporting) — consult professional advice for cross-border procurement compliance; this library does not constitute legal advice.

Glossary Cards GLOSSARY

Dual-purpose card (rendering + AI)

L40S's product positioning: RT Core graphics capability plus FP8 AI inference on one card — render farm by day, inference by night; one machine, two uses (official positioning).

AV1 codec

Next-generation video coding standard (industry estimate: ~30–50% bitrate savings over H.264 at equal quality): L40S's 3×NVENC/3×NVDEC both include AV1 — a bandwidth cost saver for streaming and cloud gaming.

NEBS Level 3

Telecom-grade equipment certification (Network Equipment-Building System): shock resistance, cooling, and reliability meeting telecom equipment room standards — L40S's NEBS Ready certification qualifies it for carrier-grade facilities (official specs).

Secure Boot with Root of Trust

Hardware root of trust secure boot: firmware signature verification against tampering — a security baseline for enterprise compliance and government procurement (official specs); include secure boot status in inspection.

16-pin power

Next-generation PCIe power connector (CEM5 spec family): 350W+ from a single connector — older PSUs need compliant adapter cables, and cable quality is a hidden variable in L40S stability.

Limitations & Controversies LIMITS

  • No NVLink, No MIG : multi-GPU setups run as parallel compute rather than an interconnect domain, with no multi-tenant partitioning—not suited to training, and weaker than the A/H series for multi-tenant pooling (per official specs[1]), so don't misapply it in your selection.
  • The PCIe Gen4 bandwidth ceiling : Gen4 x16 offers 64GB/s bidirectional — data-throughput-heavy inference workloads (large KV cache movement) are constrained by host bandwidth; only Gen5 platforms unlock it (per this library's compilation).
  • Adapter cables are a hidden failure source : 16-pin adapter cable quality for older PSUs varies widely; heating under Full Load and loosening are common return causes (per this library's inspection experience) — original cables and compliant adapters are the baseline.
  • Memory generation gap : GDDR6 at 864GB/s vs. the multi-TB/s HBM3e bandwidth of the H series — a clear gap for large-model training and very large KV cache workloads; L40S's sweet spot is inference and graphics, not training.
  • Cross-border trade policy variables : Ada architecture data center cards fall within the scope of export control lists (per public reporting) — consult professional advice for cross-border procurement compliance; this library does not constitute legal advice.

Market Notes MARKET NOTE

L40S · Market data not yet available

L40S spot supply runs in parallel as factory-new units and server pull-outs, with price differences driven by condition and channel — no verifiable unified market snapshot yet; AIXX Pedia honesty principle: no market band; prices are subject to the seller's quote 。

Spot search: AIXX Exchange Hall › (zero-commission matching, no participation in transactions, hence neutral data). This section will switch to the standard market band once sufficient market snapshots accumulate.

FAQ FAQ

L40S vs L40: which to choose?

For inference and AI, choose L40S: FP8/INT8 compute doubles (733/1,466 vs. L40's 362/733 sparse), 350W vs. 300W — the inference throughput gap exceeds the price gap; for pure rendering on a budget, look at the L40.

Can the L40S run 70B models?

After quantization, yes: INT4/FP8 at roughly 35-40GB sits right at the edge of 48GB VRAM (with tight KV cache management) and runs fine; dual cards give comfortable headroom; the FP16 original at 140GB won't fit — quantized deployment is the mainstream approach for the L40S.

Can the L40S be used for training?

Not recommended: no NVLink (no interconnect across multiple cards) and no MIG (no partitioning) — training lacks both interconnect and partitioning capability. The L40S is positioned for inference, transcoding, and graphics. For training, see the A100/H100/B300 entries.

How to verify a used L40S?

Three checks: use nvidia-smi to spot L40 fakes (FP32 91.6 vs 90.5, 350W vs 300W), inspect the 16-pin power connector and adapter cable condition (a common RMA cause), and benchmark NVENC/AV1 encode/decode (the core selling point for transcoding workloads). Also visually check the gold fingers and heatsink for originality.

Can the L40S run in a regular workstation?

You'll need to add a blower fan: the L40S is a dual-slot passive card (no fan), and tower workstation airflow can't handle 350W passive cooling — an active-cooling adapter bracket or a rack server is the right approach. Also verify the 16-pin power connector and a Gen4 x16 slot.

Model comparison and selection COMPARE

References REFERENCES

  1. NVIDIA Official — L40S Spec Snapshot (verified item-by-item against the Spec Card, as of 2026-10) https://www.nvidia.com/en-us/data-center/l40s/
  2. NVIDIA Official Website — L40 Product Page (family comparison reference) https://www.nvidia.com/en-us/data-center/l40/
  3. Listing Search — AIXX Exchange (Zero-commission Matching; no market snapshot for the L40S yet, actual price subject to the seller's quote) https://www.aixx.vip/hall.html?model=L40S
Versions and errata | This entry is maintained by the AIXX Pedia editorial team, AI-assisted drafting with human fact-checking. Updated 2026-10-10 · Version v1.0 · All changes tracked and auditable. Spotted an error? Let us know via Corrections Channel ; corrections are published after verification and recorded in version history.

Video Overview VIDEO

This Library
Editorial PolicyAbout This Library (Disclosure of Interests)Corrections Channel
Editorial Constitution Summary
Every claim sourcedDrawbacks always stated · corrections publicly loggedNo paid entries acceptedZero traffic-funneling or sales elements within entriesMarket data attached only as data modules
AIXX Family
AIXX PediaAIXX ExchangeAIXX News
Market overview: AIXX Exchange · © 2026 AIXX Pedia · An AIXX Product