SECTIONS
EDITIONS
NETWORK
Compute PowerPediaAIXX GLOBAL

AIXX Pedia › Model Comparison › B300 × H100

B300vsH100

Model Comparison · Verdict First · Side-by-Side Specs · AIXX Index Comparison · AIXX Pedia

Verdict FirstVERDICT

HOW TO CHOOSE · One-paragraph verdict
B300 Choose it when you need FP4 compute and next-generation interconnect, the budget allows, and your data center can support high power draw.
H100 Choose it when budgets are tight for sub-70B inference and HPC workloads: the largest ecosystem and deepest installed base, but 80GB of memory is a hard ceiling.
Per-GPU memory 288GB HBM3e (2.3TB total for 8 cards) vs 80GB HBM3 (640GB total for 8 cards); see table below for China-market price ranges.

Specs side by sideSPECIFICATIONS

ParametersNVIDIA B300 · Blackwell UltraNVIDIA H100 · Hopper Generation
ArchitectureBlackwell UltraHopper
Process nodeTSMC 4NPTSMC 4N
Per-card memory288GB HBM3e (2.3TB across eight cards)80GB HBM3 (640GB total across eight GPUs)
Memory BandwidthApprox. 8TB/s per card (nominal)3.35TB/s / card
GPU-to-GPU InterconnectNVLink 5 · 1.8TB/sNVLink 4 · 900GB/s
Board Power (TBP/TGP)1100W / card (available in both Air-cooled and Liquid-cooled variants)Up to 700W (configurable)
Form Factor and Cooling8-GPU air-cooled (NVL8) · 16-GPU liquid-cooled (NVL16) · GB300 superchip seriesHGX H100 8-GPU baseboard (mostly air-cooled towers · liquid-cooled variants available from OEMs)
Launch / DeliveryAnnounced at GTC 2025-03 · shipping from H2 2025Announced 2022-03 · shipping since 2022-10
China-market CadenceCirculating in mainland spot markets from H2 2025 · supply constraints ongoingSubject to China export controls since 2022-10 · not on the approved list for China
Mainland China Street Price BandApprox. 15.0–17.0M RMB/unit (entry basis 2026-10); market listings as of 10-07: 10.72–15.02M in stock (31 listings)Approx. 5.02M RMB/unit (hall real-time as of 2026-10-07 · 1 unit · whole-batch asking basis)

Specs follow NVIDIA's official public materials and the two entry pages; price bands reflect live listings in this Pedia's marketplace and fluctuate with inventory — see the entry pages' 'market band' for the latest. A '—' in both columns means the parameter is not yet cataloged in the entry.

AIXX Index Side-by-SideWANAN INDEX

AIXX Index (0–100): weighted estimate from public specs — memory 40% + interconnect 30% + ecosystem 30%, with weights adjusted by scenario. 90+ Flagship · 75+ Excellent · 60+ Usable · below 60 Not applicable. The methodology is transparent and verifiable, but is not a performance guarantee; the scores match the published figures on the two entry pages, and this page does not score separately.

Scenario IndexB300H100
LLM Inference9485
Model Training / Fine-tuning8688
Video generation82—Not Listed
Development / Workstation35—Not Listed
Scientific Computing / HPC38—Not Listed
HPC / FP64 compute—Not Listed92
Cost-Sensitive Inference—Not Listed90
Large-Memory Scenarios (Long Context / Full-Size R1)—Not Listed58
Condition / Reliability / Value Retention (Experience Index)Pending Bench TestingPending Bench Testing

“—” means this model's entry doesn't list a score for this scenario; this page does not fill it in. Experience Index (condition/reliability/resale value) awaits hands-on testing — batch inspection data is being accumulated and each unit will light up as its Inspection Report is published.

Which one for which scenarioWHICH ONE

Choose B300 when —
Choose this when you want FP4 compute and next-gen interconnect, budget is ample, and your facility can support high power draw.
Choose H100 when —
At the budget limit, sub-70B-class inference and HPC/FP64: pick this one—the largest ecosystem and thickest installed base, but the 80GB VRAM is a hard ceiling.
Confirm the bottleneck first, and instead —
When neither machine fully fits, go back to the entry pages to check specs and market price bands before deciding.

Continue VerificationLINKS

After this comparison, return to the entry pages to verify details and the latest price bands:

Footnote: This page is for reference comparison only and does not constitute a transaction offer; actual price subject to the seller's quote. Data source: AIXX Exchange (entry figures as of 2026-10; index methodology consistent with the two entry pages, transparent and verifiable).
This Library
Edit PolicyAbout this library (disclosure of interest)Errata channel
Edit Constitution Summary
Every claim sourcedDrawbacks Mandatory · Errata Publicly LoggedNo paid entries acceptedZero upselling or sales elements within entriesMarket data is mounted only as a data module
AIXX Family
AIXX PediaAIXX ExchangeAIXX News
Market data source: AIXX Exchange · © 2026 AIXX Pedia AIXX Pedia · Produced by AIXX