Spec Card SPEC CARD
Intel Gaudi 3
Intel's current flagship AI accelerator (announced at Vision 2024), a third-party AI card with native Ethernet RoCE interconnect that breaks out of the NVLink closed ecosystem, already deployed in production by IBM Cloud and in the Dell XE9680 — filling out the encyclopedia's vendor coverage
Overview
Intel Gaudi 3 is Intel's accelerator product line for large-scale AI training and inference, built on TSMC's 5nm process with a dual-die architecture: two identical compute dies work together over a high-bandwidth, low-latency interconnect bridged through an interposer. Its MME matrix engines deliver 1678 TFLOPS in both BF16 and FP8, paired with 64 TPC cores and 8 MME units. Memory is 128 GB of HBM2e (eight 16GB stacks) plus 96 MB of on-chip SRAM. The product features native Ethernet RoCE interconnect and comes in two form factors — OAM (HL-325L) and PCIe (HL-338). Typical use cases cover large-model training, inference deployment, and data center cluster scaling.
Core Specs
| Architecture | Gaudi 3 (5th-gen heterogeneous AI accelerator architecture, 2 identical compute dies bridged via interposer, software-transparent, TSMC 5nm) |
| Memory | 128GB HBM2e (8×16GB stacks, 3.6GHz, unified addressing across dual dies) |
| Memory Bandwidth | 3.7 TB/s peak |
| Compute | MME matrix: FP8 1678 / BF16 1678 / FP16(signed) 459 / TF32 459 / FP32 229 TFLOPS; TPC vector: FP8 57.3 / BF16 28.7 / FP16 28.7 / FP32 14.3 TFLOPS |
| Compute engines | 8× MME (64K MACs per MME) + 64× TPC cores (both dies combined) |
| On-die SRAM | 96MB (12.8/6.4 TB/s read/write) |
| Power | OAM HL-325L: 900W TDP (passive cooling; liquid-cooled also 900W) | PCIe HL-338 card: 600W TDP (passive cooling) |
| Interconnect | 24× 200GbE RoCE (1200 GB/s bidirectional, via 48× 112G PAM4 SerDes; 21 ports per card for GPU-to-GPU Interconnect + 3 ports for scale-out) + PCIe Gen5 x16 host interface (128 GB/s, 64 GB/s unidirectional) |
| Media decode | 14 media decoders |
| Form Factor | OAM HL-325L (OCP OAM 2.0 mezzanine) / PCIe HL-338 card (CEM 5.1) / HLB-325 universal baseboard (8-card all-to-all full interconnect, 6× OSFP800 scale-out) |
| Launch Year | 2024 (announced at Intel Vision on 2024-04-09, OEM availability Q2 2024) |
Specs verified against official documentation (
official benchmarks , updated 2026-10-10) · actual price subject to the seller's quote
Use Cases
- Distributed training of large language models, building clusters with 21 OAM-to-OAM links per OAM plus 3 scale-out ports over 24-lane 200GbE RoCE networking
- BF16/FP8 Mixed Precision inference serving, leveraging 128 GB of HBM2e to host large-parameter models
- Integrated 8-card nodes based on the HLB-325 baseboard, suited to training workloads that demand full GPU-to-GPU Interconnect and low communication overhead
- The HL-338 card with PCIe Gen5 x16 host interface, suited to elastic compute supplementation and inference scaling in existing general-purpose server rooms
Same-Family Models
| Model | Memory | Power |
|---|
| Intel Gaudi 2 Compare | 96GB HBM2E (6× HBM2E stacks) | OAM module: 600W TDP |
| Intel Data Center GPU Max 1550 Compare | 128GB HBM2e (each Xe-Stack with its own HBM2e stacks; Aurora single-card STREAM measured 2.1TB/s) | 600W TDP (ARK official; Aurora ECP deployments configured CPU/GPU at a balanced 4kW, with GPU sustained around the 500W tier) |
| Intel Data Center GPU Max 1100 Compare | 48GB HBM2e (ARK official; SURF node configuration listed as 'Max 1100 48G XeLink') | 300W TDP |
Video Overview VIDEO
Procurement & Inspection Notes
- Mind the form factor and thermal constraints: the OAM HL-325L is passively cooled, and the PCIe HL-338 is also passively cooled. Before purchase, confirm that rack airflow, air ducts, and airflow organization can meet the card's cooling requirements; for sealed high-density nodes, evaluate Liquid-cooled solution compatibility
- Verify data center network conditions: the product's interconnect is based on 200GbE RoCE, and the HLB-325 baseboard connects externally via 6 OSFP800 ports. Plan Ethernet switches, optical modules, and cabling in advance — no proprietary closed interconnect ecosystem required
- Cross-check the whitepaper during inspection: the official technical document (doc 817486) does not provide sparse compute or Memory Bus Width fields; if a vendor's figures include sparse metrics, request the test conditions. Also confirm the host-side PCIe Gen5 x16 slot specs and power delivery meet the card's requirements
FAQ
How much of an improvement is Intel Gaudi 3 over the previous-generation Gaudi 2?
According to Intel's figures announced at Vision 2024, Gaudi 3 delivers 4× the BF16 AI compute and 1.5× the memory bandwidth of Gaudi 2, with the process node upgraded from Gaudi 2's 7nm to 5nm, and an architecture switched to dual dies interconnected via an interposer.
What's the difference between the OAM and PCIe versions of Gaudi 3?
The OAM version (HL-325L) targets high-density cluster nodes, with GPU-to-GPU Interconnect via 21 OAM-to-OAM links per card and an 8-card system built on the HLB-325 baseboard, offering 24 lanes of 200GbE RoCE externally. The PCIe version (HL-338) uses a standard PCIe CEM 5.1 interface and plugs directly into general-purpose servers, offering more flexible networking and deployment — but its interconnect topology and density fall short of the OAM solution.
What network environment does Gaudi 3 require? Does it depend on a proprietary interconnect protocol?
Gaudi 3 natively uses Ethernet RoCE interconnect. Each OAM provides 24 lanes of 200GbE (implemented via 48 lanes of 112G PAM4 SerDes), of which 21 are used for OAM-to-OAM interconnect and 3 for scale-out. This means users can build clusters on standard Ethernet switches without depending on a closed proprietary interconnect ecosystem — though they do need switches that support 200GbE RoCE and the corresponding optical interconnect resources.