Spec Card SPEC CARD
AMD Instinct MI308X
AMD's take on the 'H20 playbook' — a China-compliant cut-down of the MI300X: compute cores reduced to 1/4 while memory and bandwidth remain untouched (192GB), built for large-model inference; after the 2025-04 controls, even the compliant card was blocked, AMD booked an $800M charge, and only a 15% revenue-share arrangement in exchange for licenses restored shipments in 2025Q4 (~$390M); circulating volume is far below the H20, making this card in the second-hand market more of a 'policy bellwether plus rare full-system pull' supply; with H200/MI325X approved for China from 2026, its window is closing
Overview
The AMD Instinct MI308X is a data center GPU AMD built for the China market, best understood as a China-compliant cut-down of the MI300X. The core design idea: reduce the compute core count (to just one quarter of the MI300X's) to satisfy export controls while fully preserving the capacity and bandwidth of the HBM3e memory subsystem — 192GB in total — positioning it as an inference-dedicated accelerator for large models. In the channel, the card ships as OAM modules paired with UBB baseboards in full server systems, with Supermicro as the flagship channel. Due to the back-and-forth of US export licensing policy in 2025, its supply cadence depends heavily on regulatory approvals, and market availability is notably smaller than comparable China-market Variant products.
Core Specs
| Architecture | CDNA3 |
| Memory | 192GB HBM3/HBM3e |
| Memory Bandwidth | Not officially disclosed |
| Compute | Not officially disclosed, and we won't invent numbers. Verified qualitative facts only: compute cores are roughly 1/4 of the MI300X; FP8 is supported — an 8×MI308X real-machine setup completed BF16-FP8 blockscale GEMM running Step3 321B MoE, with decode throughput 1.30× that of 8×H20 and prefill at 0.70×; no official TFLOPS/TOPS figures exist, and there is no official FP4 messaging (the CDNA3 generation doesn't support FP4 — unrelated to the MI350 series) |
| Compute Units | Not officially disclosed |
| Power | Not officially disclosed |
| Interconnect | Not officially disclosed |
| Launch Year | Project revealed in 2024 (media confirmed the China-market Variant design from 2024-03; originally slated for 2024Q4, later pushed to 2025); halted by the new license requirement on 2025-04-15; Commerce Department review resumed 2025-07-15; partial licenses granted 2025-11; actual China shipments in 2025Q4 (~$390M in Q4 revenue) |
| Form Factor | OAM + UBB |
| Naming conventions | Official written naming is 'AMD Instinct MI308 / MI308 products' (8-K/earnings releases); spoken and SKU naming is 'AMD Instinct MI308X' (Lisa Su's earnings-call wording + AMD P/N 100-300000072H on the channel page). Both names refer to the same product: MI308 is the product-line designation, MI308X the SKU designation |
| Export compliance context (China) | A China-compliant card designed after the 2023-10 US export controls (compute cut to roughly 1/4 of the MI300X, memory and bandwidth preserved); on 2025-04-15 the new BIS license requirement halted even this 'compliant card'; review resumed 2025-07-15; on 2025-08-11 reports emerged that Nvidia/AMD had reached a 15% revenue-sharing arrangement with the US government on China chip sales; on the 2025-11-04 Q3 earnings call AMD disclosed partial licenses had been granted; on 2025-12-04 Lisa Su publicly confirmed holding licenses and accepting the 15% share; actual 2025Q4 shipments totaled ~$390M; Q1 2026 guidance shrank to ~$100M — after the new US rules cleared H200/MI325X for China in 2026-01, this card's window role is winding down |
| Official financial disclosures (AMD's own words) | 2025-04-15 8-K: expected charges of up to 'approximately $800 million' | Q1 earnings call (2025-05-06): $700M Q2 revenue impact, ~$1.5B for the full year | Q2 actual charge of $800M for inventory and reserves | Q3 (2025-11-04): no China revenue in Q3, none in Q4 guidance either | Q4/FY25 (2026-02-03): ~$390M Q4 China revenue + ~$360M reserve release, FY25 net charge ~$440M |
Specs verified against official documentation (
official benchmarks , updated 2026-10-10) · actual price subject to the seller's quote
Use Cases
- Large language model inference serving: the 192GB HBM3e memory fits large-parameter model weights, and with deeply tuned FP8 and BF16 blockscale GEMM it suits high-concurrency, long-context inference workloads — third-party real-machine tests show decode throughput ahead of same-generation China-market competitors
- Hosting and private deployment of MoE-architecture large models: in third-party comparison tests on models like Step3 321B MoE, an 8-card system delivered stable decode throughput and latency, well suited to sparsely activated models that need a large memory pool
- Enterprise AI workloads that are memory-capacity sensitive but need only moderate compute: tasks like long-document understanding and batch text processing that lean memory-bound, where the uncompromised memory capacity is a clear advantage
- Compliant capacity expansion for existing AMD ROCm ecosystem users: domestic users already on the Instinct platform can source this card through full-system channels during the policy licensing window, keeping their software stack and operations practices intact
Same-Family Models
Video Overview VIDEO
Procurement & Inspection Notes
- Channel and form-factor verification: legitimate supply comes mainly as OAM+UBB full systems from OEMs like Supermicro, with SKUs such as 'GPU-AMDMI308X-OAM-0072H'; loose single-card supply is extremely scarce. When purchasing, prioritize confirming the system's origin and the completeness of the accompanying UBB baseboard, and avoid pulls of unknown provenance. AMD's website has no public spec page for this model, so verification cannot rely on an official spec sheet — channel documentation and hands-on testing are the reference
- Compliance and policy risk assessment: this card's export license status has swung repeatedly, AMD accepted a 15% China revenue share to resume shipments, and from 2026 higher-spec products like the H200/MI325X have been approved for China — the MI308X supply window is narrowing. Purchase contracts should spell out delivery and refund terms in case a license lapses or controls tighten further, and residual-value risk should be assessed
- Data center deployment notes: the card is an OAM module and must be paired with a UBB (OAM baseboard) to form an 8-card interconnected system — it cannot be flexibly inserted into general-purpose servers like a PCIe card. Rack planning should reserve space for the full system's dimensions, power, and cooling; spares and maintenance should also go through system channels rather than retail, with supply lead times locked in advance
FAQ
What's the difference between the MI308X and the MI300X?
The MI308X is the China-compliant version of the MI300X, with roughly one quarter of the compute cores but identical HBM3e memory subsystem capacity and bandwidth — still 192GB. That trade-off makes it better suited to memory-bound inference workloads than compute-intensive training tasks.
Can you still buy the MI308X now? Are loose cards or full systems more trustworthy?
MI308X shipments to China were fully banned for a period in 2025, with limited shipments resuming in Q4 2025 after license approvals and the revenue-share arrangement. Legitimate supply comes mainly as OAM+UBB full systems from OEMs like Supermicro, with very few loose single cards. Given that higher-spec products have since been approved for China and this model's window is closing, buy through system channels, verify licensing and provenance, and steer clear of loose cards of unknown origin.
How does the MI308X perform at large-model inference?
Third-party real-machine testing shows an 8-card MI308X system delivers about 1.30× the decode throughput of an 8-card H20 system with lower latency, but only about 0.70× the prefill throughput. Overall, the card has the edge on decode-heavy inference workloads; prefill-sensitive workloads need separate evaluation.