AIXX Pedia › Model Entry › NVIDIA B30A (Rumor)

NVIDIA B30A is a NVIDIA China-market compliant Blackwell-architecture variant (positioned as the H20 successor): a streamlined design based on Blackwell/Blackwell Ultra, rumored to feature 144GB HBM3E and roughly 4TB/s of bandwidth, with a dual-die design — NVIDIA has never officially confirmed this product , all specs are based on media/supply-chain leaks[7].
Its market significance: the China-market variant line jumps a generation from Hopper (H20) to Blackwell — rumors suggest performance above H20 and even above H100, with rumored pricing around $6,500–8,000 positioned as the "strongest Blackwell within compliance limits". For AI infrastructure buyers in mainland China, this is one of the most noteworthy new-product variables of 2026 — but everything is subject to official NVIDIA confirmation; this entry maintains sourcing discipline based on leaks throughout 。
August 2025 , Reuters was first to report that NVIDIA is developing a new AI chip for the China market (leaked name: B30A, more powerful than the H20)[7].
August 2025 , AMD/NVIDIA reached an arrangement with the US government to hand over 15% of China-bound sales revenue (per public reporting[8]).
H2 2025 – 2026 , Per leaks: sampling and mass production are in progress (Q4 2025 production rumors[7]); NVIDIA remains officially silent, and all specs are unofficial.
| Item | Specifications (leaked, not confirmed by NVIDIA[7]) |
|---|---|
| Architecture | Streamlined Blackwell/Blackwell Ultra (dual die · TSMC N4P, per rumors) |
| Board Memory | 144GB HBM3E (rumor, about half of B300) |
| Memory Bandwidth | Approx. 4TB/s (rumor) |
| GPU-to-GPU Interconnect | NVLink (rumored support) |
| Rumored pricing | Approx. $6,500–8,000 (rumor) |
| Mass Production | Rumored from Q4 2025 (not officially confirmed) |
| Item | B30A (rumor) | H20 (currently shipping) | AMD MI308 (rumor) |
|---|---|---|---|
| Board Memory | 144GB HBM3E | 96GB HBM3 | 192GB HBM (leaked) |
| Architecture generation | Blackwell | Hopper | Streamlined CDNA |
| Status | Rumor (not officially confirmed) | Currently shipping | Licensed for supply |
The B30A (rumor) is positioned as a new generation in NVIDIA's China-market variant line:
The cooling form factor is unconfirmed by rumor — based on the H20's dual PCIe/HGX convention and the B30A's positioning, it is expected to ship primarily in an air-cooled-compatible form factor (unconfirmed by rumor). Deployment planning is subject to official NVIDIA confirmation.
| Scenario | Fit assessment (extrapolated from the rumored 144GB capacity) |
|---|---|
| Large-model inference | 144GB: resident FP16 for 100B-class models, resident quantized 200B+ class (extrapolated) |
| Blackwell generational gap | FP4/FP6 low-precision support (if Blackwell features carry over, per rumors) — a potential plus for inference throughput |

In production scheduling (contingent on official confirmation).
The rumor points to the CUDA stack (continuation of NVIDIA's full suite): a smooth upgrade for the existing H20 ecosystem — this is its core competitive advantage over the ROCm camp (MI308). Blackwell architecture features (if inherited) imply newer CUDA/driver version requirements.
Diagnostic tools (if the product ships, expected to be the standard NVIDIA stack): nvidia-smi, DCGM, gpu-burn, nccl-tests, bandwidthTest — see general diagnostic snippets at H100 entry 。
| Stage | Key Points |
|---|---|
| Compliance | China licensing policy is volatile — cross-border and domestic transfers are subject to current license documentation |
| Insurance | Insure at full cargo value (based on leaked pricing of $6,500–8,000[7]) |
OEM form factor unconfirmed by rumor — following the H20 convention (Server OEM / Integrator HGX/PCIe dual form factors), subject to official confirmation.
| Date | Type | Market | Price Band | Basis |
|---|---|---|---|---|
| 2026-10 | Channel Reference | Mainland China | Leaked pricing around $6,500–8,000 (per public reporting[7], unofficial) | Product not officially confirmed |
| 2026-10 | Marketplace Status | Mainland China | Not yet listed · channel quotes | Marketplace Search › |
| Time | Timeline (all from public reporting) |
|---|---|
| 2025-08-19 | Reuters first reported NVIDIA developing a new AI chip for China (precursor leak to the B30A[7]) |
| 2025-08 | 15% revenue remittance arrangement announced[8] |
| Q4 2025 (rumor) | Rumored mass-production window (not officially confirmed) |
| 2026 | Rumor: supply and market push in progress — subject to official confirmation[7] |
| [1] | Reuters · Report on NVIDIA developing a new AI chip for China (2025-08-19, source of B30A rumors) · https://www.reuters.com/world/china/nvidia-working-new-ai-ch (per public reporting) |
| [2] | Public reporting · B30A spec/pricing/mass-production rumor roundup (144GB HBM3E / $6,500-8,000 / N4P) · https://www.tomshardware.com/pc-components/gpus (leak-based figures) |
| [3] | Public reporting · AMD/NVIDIA 15% China revenue-share arrangement (2025-08) · https://www.reuters.com/technology/ (per public reporting) |
| [4] | Public reporting · BIS case-by-case review of H200/MI325X (2026-01-15) · https://www.bis.gov/ (per public reporting) |
| [5] | NVIDIA Official · Product line containing H20 (for comparison) · https://www.nvidia.com/ (official) |
| [6] | Hall · Compliant AI card inventory search · /hall.html (this site's methodology) |
| [7] | Selector · VRAM capacity accounting · /wiki/xuanxing.html (this site's methodology) |
| [8] | This entry · Rumor disclaimer and procurement discipline · /wiki/b30a.html (this site's methodology) |
All specifications and timelines in this entry are "public reporting/rumor" — NVIDIA has not officially confirmed the B30A; procurement decisions should follow official announcements and real-world testing.