AIXX EXCHANGE
Inspection Report
Inspection Report 9566-4520-4746
Summary
On-site verification completed. Configuration and serials matched; exceptions are itemized.
Summary
Report 9566-4520-4746 was issued by AIXX Exchange on 2026-10-23 for H20 8-GPU Server. Verification method: On-site Acceptance. Result: S- · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.
Configuration
Checklist
| GPU SKU & memory | PASS | 100% | |
| NVLink / fabric | PASS | 100% | |
| Serial / SN consistency | PASS | 24/24 | |
| Cosmetic & accessories | PASS | 100% | |
| Firmware & diagnostics | PASS | 100% | |
| Thermal visual inspection | PASS | 100% | |
| Packaging & sealing | PASS | 100% | Manufacturer carton with tamper-evident seal |
| Pressure test | NOT_EXECUTED | 0% | Owner not permitted |
| SN FB********** | PASS | 1 | |
| SN QY********** | PASS | 1 | |
| SN O3********** | PASS | 1 | |
| SN AH********** | PASS | 1 | |
| SN TG********** | PASS | 1 | |
| SN Z3********** | PASS | 1 | |
| SN E8********** | PASS | 1 | |
| SN 8B********** | PASS | 1 | |
| SN 3V********** | PASS | 1 | |
| SN 3B********** | PASS | 1 | |
| SN Y6********** | PASS | 1 | |
| SN 4L********** | PASS | 1 | |
| SN VN********** | PASS | 1 | |
| SN 3F********** | PASS | 1 | |
| SN PP********** | PASS | 1 | |
| SN ZE********** | PASS | 1 | |
| SN IU********** | PASS | 1 | |
| SN 7V********** | PASS | 1 | |
| SN Q4********** | PASS | 1 | |
| SN G4********** | PASS | 1 | |
| SN HC********** | PASS | 1 | |
| SN SW********** | PASS | 1 | |
| SN WD********** | PASS | 1 | |
| SN 19********** | PASS | 1 | |
Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.
© 2026 AIXX · aixx.vip / aixx.ai · Chinese