AIXX EXCHANGE
Inspection Report
Inspection Report 4654-7832-4261
Summary
On-site verification completed. Configuration and serials matched; exceptions are itemized.
Summary
Report 4654-7832-4261 was issued by AIXX Exchange on 2026-10-28 for RTX PRO 6000 Blackwell 8-GPU Server. Verification method: On-site Acceptance. Result: A+ · Valid. Asking prices are not transaction prices. The report number is globally unique and can be verified in real time on the AIXX verification page.
Configuration
Checklist
| GPU SKU & memory | PASS | 100% | |
| NVLink / fabric | PASS | 100% | |
| Serial / SN consistency | PASS | 26/26 | |
| Cosmetic & accessories | PASS | 100% | |
| Firmware & diagnostics | PASS | 100% | |
| Thermal visual inspection | PASS | 100% | |
| Packaging & sealing | PASS | 100% | Original factory carton, seals intact |
| Pressure test | NOT_EXECUTED | 0% | Owner not permitted |
| SN V9********** | PASS | 1 | |
| SN RY********** | PASS | 1 | |
| SN T2********** | PASS | 1 | |
| SN NR********** | PASS | 1 | |
| SN VA********** | PASS | 1 | |
| SN YS********** | PASS | 1 | |
| SN XM********** | PASS | 1 | |
| SN IZ********** | PASS | 1 | |
| SN TK********** | PASS | 1 | |
| SN AV********** | PASS | 1 | |
| SN 7O********** | PASS | 1 | |
| SN 3L********** | PASS | 1 | |
| SN UW********** | PASS | 1 | |
| SN IY********** | PASS | 1 | |
| SN D3********** | PASS | 1 | |
| SN VE********** | PASS | 1 | |
| SN TU********** | PASS | 1 | |
| SN WW********** | PASS | 1 | |
| SN IR********** | PASS | 1 | |
| SN 80********** | PASS | 1 | |
| SN AF********** | PASS | 1 | |
| SN O0********** | PASS | 1 | |
| SN 8T********** | PASS | 1 | |
| SN PJ********** | PASS | 1 | |
| SN SC********** | PASS | 1 | |
| SN LC********** | PASS | 1 | |
Issued by AIXX Exchange. Asking prices are not transaction prices. Report numbers are globally unique.
© 2026 AIXX · aixx.vip / aixx.ai · Chinese