AIXX EXCHANGE
Informe de inspección
Informe de inspección 0320-6002-2169
Conclusión
On-site verification completed. Configuration verified; serial check notes are itemized.
Summary
El informe 0320-6002-2169 fue emitido por AIXX Exchange el 2026-11-04 para DGX Station GB300. Método de verificación: Aceptación in situ. Resultado: A · Válido. Los precios de lista no son precios de transacción. El número de informe es único a nivel mundial y se puede verificar en tiempo real en la página de verificación de AIXX.
Configuración
Lista de comprobación
| GPU module verification | PASS | 100% | |
| CPU model x count verification | PASS | 100% | |
| Memory population x capacity | PASS | 100% | |
| SSD / boot device verification | PASS | 100% | |
| DPU / NIC verification | PASS | 100% | |
| PSU redundancy verification (built-in redundant) | PASS | 100% | |
| System assembly & cooling inspection | PASS | 100% | |
| Serial number cross-check (chassis/modules/packaging) | PASS | 17/17 | |
| Cosmetic & accessories | PASS | 100% | |
| Firmware & diagnostics | PASS | 100% | |
| Packaging & sealing | PASS | 100% | Original factory carton, seals intact |
| Pressure test | NOT_EXECUTED | 0% | Owner not permitted |
| SN 2X********** | PASS | 1 | |
| SN HQ********** | PASS | 1 | |
| SN DW********** | PASS | 1 | |
| SN IW********** | PASS | 1 | |
| SN I8********** | REVIEW | 1 | Serial re-check scheduled against manufacturer records |
| SN GW********** | REVIEW | 1 | Second verification visit being scheduled |
| SN U4********** | PASS | 1 | |
| SN D3********** | PASS | 1 | |
| SN R7********** | PASS | 1 | |
| SN CT********** | PASS | 1 | |
| SN BC********** | PASS | 1 | |
| SN ZZ********** | PASS | 1 | |
| SN RX********** | PASS | 1 | |
| SN FT********** | PASS | 1 | |
| SN X1********** | PASS | 1 | |
| SN Y1********** | PASS | 1 | |
| SN 77********** | PASS | 1 | |
Emitido por AIXX Exchange. Los precios de lista no son precios de transacción. Los números de informe son únicos a nivel mundial.
© 2026 AIXX · aixx.vip / aixx.ai · Chino